Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Replace Campus Boilers - Five Buildings
Alteration
Bidding
$850,000 est. value
Alamosa, CO 81101

Borick Hall Boiler Replacement
Alteration
Bidding
Gunnison, CO

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Rangeview Boiler Replacement
Post-Bid
Aurora, CO 80013

SB267 Replace Boiler Economizer, Central Plant, CMHIP
Results
Less than $40,000 est. value
Pueblo, CO 81003

16" Sleeve Valve and Spool Refurbishment
Results
Berthoud, CO 80513

Boiler Replacement at Remington Building
Alteration
Bidding
Lakewood, CO 80215

Greeley Central HS Boiler and DHW Replacements
Post-Bid
Garden City, CO 80631

SB267 Repairs/ Upgrades to Mechanical and Electrical Systems-Three Troop Offices / Adams
Results
$158,200 est. value
Commerce City, CO 80022

Water Heater Replacement
Alteration
Bidding
Denver, CO 80228

Cu Anschutz Pn19-129407-Scpp Pre-Qualified Only
Post-Bid
Less than $220,238 est. value
Denver, CO

Refurbish Hydronic Heat System at Johnson Building
Results
Rangely, CO 81648

Elevator and Conveyance Inspection Services
Post-Bid
Brighton, CO

Last Updated 07/03/2021 01:53 AM
Project Title

Boiler Procurement - High Temperature Hot Water

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

High Temperature Hot Water Boiler as described in the Bidding Documents prepared by RMH Group, dated 5/10/21. The Purchase Order (PO) for the new boiler will be assumed by a General Contractor (To be selected under separate procurement process at a later date) for completion of purchase. General Contractor to be responsible for coordinating delivery with Boiler Manufacture, and for placement of the new boiler within the Heat Plant.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents