Similar Projects
Parking Areas - Expo FY20
Bidding
OH

Parking Lot Overlay/Resurfacing and Curb Replacement
Post-Bid
Columbus, OH

Gate Replacement
Post-Bid
Columbus, OH 43211

Goodale Park Paver Replacement
Results
Columbus, OH

Operation Sidewalks-School Sidewalks 2018
Results
Columbus, OH

Northam Road Shared Use Path
Post-Bid
Upper Arlington, OH

Lancaster and Main Parking Lot - Phase 1
Results
Less than $492,687 est. value
Reynoldsburg, OH

Center Street Public Space, Parking Lot, and Trailhead Improvements (CIP LB-17)
Post-Bid
Less than $815,500 est. value
Hilliard, OH

Dublin Arts Council Entry Plaza Improvements
Results
Dublin, OH 43016

Installation of a Rectangular Rapid Flashing Beacon, Pedestrian Crossing with Refuge Island and Associated Curb Ramps
Post-Bid
$44,771 est. value
Worthington, OH

Hilliard Latham Park Multipath Improvement LB - 22
Results
Less than $115,000 est. value
Hilliard, OH

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Akron, Athens, Avon, Bellefontaine, Cincinnati, Columbus, Defiance, Huber Heights, Kent, Marietta, Mason, Saint Clairsville, Sidney, Wadsworth, Wheelersburg, Xenia, Youngstown, OH

ADA Curb Ramps - Citywide Curb Ramps 2018
Results
Less than $528,039 est. value
Columbus, OH

Bexley Parking Lot Repairs
Post-Bid
Bexley, OH 43209

Buckeye Parkway and Mallow Lane Intersection Improvements Project
Results
Less than $237,116 est. value
Grove City, OH

Last Updated 12/12/2018 09:45 AM
Project Title

Short North SID-High Street Improvements Phase 3

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,927,225
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work for this project consists of the replacement of the sidewalk and curb on both sides of North High Street between West Starr Avenue and East 9th Avenue; landscaping planter beds and street trees will be installed; North High Street will be planed and overlaid; mast arm traffic signal facilities will be installed and other traffic control improvements will be implemented; street and pedestrian light fixtures will be replaced within the project limits; storm sewer systems will be installed; all overhead utilities along North High Street.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents