Similar Projects
Mill Levy 11
Bidding
$1,750,000 to $2,100,000 est. value
Denver, CO

2021 Street Preservation
Bidding
Brighton, CO

Cow Quiet Zones
Post-Bid
Westminster, CO 80031

Wise Binney Connection Pipeline
Post-Bid
$19,000,000 est. value
Aurora, CO 80111

Water Softening Project 24 Inch Transmission Line
Results
Commerce City, CO

1-1/2" Mill And Fill and Pipe Replacements
Results
$1,000,000 to $5,000,000 est. value

Gateway Center Filing 7 Phases 1 and 2
Bidding
Denver, CO 80239

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Concrete Panel Removal and Replacement, Joint Sealing, Dowel Bar Retrofit, Full Depth Repair, Asphalt Resurfacing, and Pavement Markings
Results
$1,000,000 to $5,000,000 est. value

Cross Connection Devices
Bidding
Denver, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

Repairs Pavement Improvements at McCaslin Boulevard and Main Street
Bidding
Denver, CO

2020 Mount View Drainage Improvements Program
Term Contract
Post-Bid
Brighton, CO 80601

Havana and Colfax Avenue - Westbound Left Turn Extension Project
Results
Less than $300,000 est. value
Aurora, CO 80010

Last Updated 02/11/2021 09:17 AM
Project Title

Reunion Center Stead School Phase District: Reunion Center Metropolitan District No 1

Physical Address View project details and contacts
City, State (County) Commerce City, CO 80022   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of the construction of utilities, roadway, and drainage infrastructure for the Reunion Center Metropolitan District #1 associated with Reunion Center - STEAD School Phase located along Walden Street near 104th Avenue in Commerce City, CO. Utility improvements include potable & non-potable water lines. Roadway improvements include curb and gutter, sidewalk, reconditioning, asphalt and concrete pavement, traffic signal, pavement markings, and signage. Drainage improvements include storm sewer construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents