Similar Projects
Roadway Signing - Northern and Southern Queue Warning System
Infrastructure
Bidding
$5,080,295 est. value

Systemwide Guardrail and Fencing Maintenance
Term Contract, Infrastructure
Bidding
FL

Metrorail Acoustical Barrier Replacement Phase 3 (Part 2 of 2)
Post-Bid
Less than $39,825,990 est. value
FL

Flexible Delineator Post
Term Contract
Post-Bid

Picnic Area Signage
Results
Miami, FL 33129

Airport Pavement Marking Condition Assessment Services and/or Airport Pavement Marking and Services
Term Contract
Results

Illuminated Street Name Signs
Infrastructure
Bidding
$292,800 est. value
Miami, FL

Paving Markings Installation
Post-Bid
Less than $314,189 est. value
Miami, FL 33138

FY-20-21 Highway Striping and Signage
Results
$187,000 est. value
Hialeah, FL 33010

Emergency Response Ground Mounted Traffic Control Signs Restoration
Infrastructure
Bidding
$3,077,734 est. value
Miami, FL

PTP Paving Markings Installation
Post-Bid
Less than $297,746 est. value
Miami, FL

Jackson North Building Signage
Results
North Miami Beach, FL 33139

Emergency Response for Ground Mounted Traffic Control Signs Restoration
Infrastructure
Post-Bid
$2,797,900 est. value
FL

Markers, Delineators and Reflectors
Results
Less than $150,000 est. value
FL

Libraries Digital Signage
Alteration
Post-Bid

Last Updated 05/12/2022 07:01 PM
Project Title

Wrong-Way Driving (WWD) Countermeasures at Various Ramp Locations

Physical Address View project details and contacts
City, State (County) FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Design-Build Firm shall furnish all engineering and all of its associated direct and indirect costs, construction labor, materials, equipment, supervision, tools, transportation, and supplies required to complete the work in accordance with the requirements of the Contract Documents. The terms and conditions of this Contract are fixed price and fixed time

Details

Division 01 - General Requirements, Temporary Construction, Temporary Ramps.
Division 10 - Specialties, Signage.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents