Similar Projects
I-285/I-20 West Interchange Project
Design
Atlanta, GA 31175

CDBG-Sandy Bottom Neighbohood
Infrastructure
Bidding
$830,000 est. value
GA

T32-D3-PavePRes-SR127 Marion Taylor-122082
Infrastructure
Bidding

Cleaning of Aerobic Lagoon for WPCP
Post-Bid
Dudley, GA 31022

CY 2020 Pavement Maintenance Project
Post-Bid
$5,200,000 to $6,200,000 est. value
Athens, GA 30603

Broad Street Improvements
Results
Powder Springs, GA 30127

Arglass Road - Grading, Drainage, Base and Paving
Results
Less than $789,567 est. value
Remerton, GA 31601

Triple Surface Treatment Paving
Infrastructure
Bidding
Cleveland, GA 30528

Clay County LMIG Road CR 52
Post-Bid
Fort Gaines, GA 39851

Parsons Road Right Turn Lane Improvement Project
Results
Johns Creek, GA 30097

2018-2019 Local Maintenance And Improvement Grant Project
Post-Bid
Cusseta, GA 31805

2020 Street Resurfacing
Results
Less than $4,441,710 est. value
Tucker, GA 30084

Resurfacing of Various City Streets
Post-Bid
Cartersville, GA 30120

Peachtree Corridor Phase III
Results
Atlanta, GA 30303

Storm Drainage and Street Improvements Phase III
Post-Bid
Bronwood, GA

Last Updated 07/29/2021 08:39 AM
Project Title

East 14th Street Roadway Improvements

Physical Address View project details and contacts
City, State (County) Rome, GA 30161   (Floyd County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, tools, equipment, and materials necessary to construct the East 14th Street - Bobo Street Roadway Improvements and Rear Entrance to East Central School. This project consists of roadway improvements including drainage improvements, installation of curb & gutter, leveling/widening and paving of approximately 750 linear feet of East 14th Street and Bobo Street including the construction of a new cul-de-sac meeting City of Rome Standards. Construction will also include a new rear entrance approximately 400 feet long for East Central Elementary School which connects to the new cul-de-sac at the terminus of Bobo Street. Said drive will include associated drainage structures, curb & gutter, and a paved roadway connecting to the existing parking lot. Two handicap ramps are required at the intersection of East 14th Street and Dean Avenue

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents