Similar Projects
World-Class Sport Shooting Resort Park
New Construction
Conception
Whitesburg, KY

Waterfront Park Phase IV Expansion
New Construction
Conception
Louisville, KY 40202

New Sports Complex
New Construction
Design
Henderson, KY

Operation of Halloween Attraction at Otter Creek Outdoor Recreation Area (OCORA)
Renovation
Bidding
$80,000 est. value
Brandenburg, KY 40108

First Southern Veterans Park Baseball Concession Stand 2021
Renovation
Post-Bid
Stanford, KY

Outdoor Pavilion
Renovation
Post-Bid
$700,000 est. value
Flemingsburg, KY 41041

Baseball Field Backstop Safety System
Results
Union, KY 41091

Falling Springs Recreation Center Baseball Cages
Results
Versailles, KY

Hurstbourne Commons
New Construction
Pending Verification
Louisville, KY 40213

Glasgow Park Project
New Construction - 104,544 SF
Pending Verification
$15,000 est. value
Glasgow, KY 42141

Farmers Market Canopy
Renovation
Post-Bid
Winchester, KY

New Baseball Field for Miracle League-Mike Miller Park
New Construction
Results
$600,000 est. value
Benton, KY 42025

Cumberland Mint
New Construction
Pending Verification
Williamsburg, KY

Entertainment Complex Developer RFP
Renovation
Post-Bid
Versailles, KY 40383

WHFRTC Automated Pistol Range Upgrade
New Construction
Results
$469,300 est. value
Greenville, KY 42345

Reported 05/25/2022 12:00 AM
Project Title

Carroll Chimes Bell Tower - Goebel Park / Mainstrasse

Physical Address View project details and contacts
City, State (County) Covington, KY 41011   (Kenton County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Restoration/service/ remodel of the Carroll Chimes Clock Tower as follows: Provide all safety, material, labor & equipment to complete the following work Provide ground protection, pedestrian and traffic control Supply man lifts to complete work Remove all vines & vegetation Install copper rain table, all seams hand soldered. Replace counter flashing at lower rear and upper front copper roofs Pressure wash entire Bell Tower as specified in pictures Grind & tuck point open or cracked mortar joints over 1/16 of an inch (200 LF) Install new European 18oz copper half round gutters at rear lower standing seam roof; Completed with new 4" round downspouts in aluminum Remove 4 rowlocks pier caps & rebuild Replace wood and repair cupola and paint. Repair and replace bad wood timber as needed on upper clock tower and then paint Remove & rebuild double rowlock ban all 4 sides Grind out 4 ledge angles Prime, Pack with backer rod & Caulk all ledge angles using Dow Corning 795 Final cleaning of Bell Tower Waterproof entire Bell Tower as specified in the pictures using Prosoco WB Water Repellent Final cleanup Excludes: any interior masonry work

Details

Misc. Recreational, Renovation.
Division 13 - Special Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents