Similar Projects
DBEH 21-1535 Install Rotary Fan
Term Contract
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

HVAC Water Treatment Services and Supplies
Alteration
Bidding
Viera, FL

Brevard County Detention Center Kitchen HVAC Replacement
Alteration
Bidding
Cocoa, FL 32926

Brevard Public Schools Locker Room HVAC Projects
Post-Bid
Melbourne, FL 32901

HVAC and Mechanical Products
Term Contract
Post-Bid

Construct HV Duct Bank, Trident MACA
Results
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL 32920

Replace Chiller Bldg 1317
Results
Patrick AFB, FL 32925

Logistics Facility Heating, Ventilation and Air Conditioning (HVAC) Replacement
Post-Bid
$1,000,000 to $5,000,000 est. value
FL 32899

HVAC Services and Repair
Term Contract
Results
Viera, FL 32940

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Repair HVAC System, Bldg 3656, PAFB
Results
Patrick AFB, FL 32925

Brevard (Viera) CHD - Chiller Replacement
Post-Bid
Viera, FL

Replace HVACS-Canaveral Nat'L Seashore, FL
Results
Titusville, FL 32796

Logistics Facility Heating, Ventilation and Air Conditioning (HVAC) Replacement, Kennedy Space Center, Fl.
Post-Bid
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL

Residential HVAC Replacement Services
Term Contract
Results
Viera, FL 32940

Reported 08/13/2021 12:00 AM
Project Title

PSFB Malabar Chiller Replacement

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32907   (Brevard County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Item 0001: 20 Ton Trane Water Cooled Chiller Salient Characteristics: Air-Cooled Scroll Packaged Chiller Startup Included - Trane Service must start equipment for warranty to be honored 20 nominal tons 208 volt 3 phases High efficiency/performance Grooved pipe connection Factory insulation 1.25" - high humidity/low evaporator temperature Lanced aluminum fins Across the line starter/direct on line Single point connection main line unit power-ancillary items require other power Terminal block conn for incoming lines Enclosure type UL 1995 rated for outdoor applications LonTalk/Tracer Summit interface Dual high head pump Pump flow ctrl by var speed drive With buffer storage tank Elastomeric isolators Water strainer factory installed Super quiet Architectural louvered panels 10 year parts/labor/refrigerant warranty Blygold Coil & Cabinet

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents