Similar Projects
Last Updated | 09/08/2022 03:57 PM |
Project Title | Bissell - Coldwater - Missouri - Meramec Public I/I Reduction (2023) Contract C |
Physical Address | View project details and contacts |
City, State (County) | Florissant, MO 63031 (Saint Louis County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,518,791 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract consists of the rehabilitation of approximately 38,363 lineal feet of sewers, varying in size from 8-inches to 36-inches in diameter, utilizing cured-in-place-pipe (CIPP) methods, 28 manholes, 756 service connections, and 4 point repairs to be constructed. Located various sites, in the City of Florissant, Missouri The Engineers Opinion of Probable Cost for this project is $2,467,000. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |