Similar Projects
Roanoke - South Weston Road
Infrastructure
Design
$6,200,000 CJ est. value
Weston, WV 26452

Roanoke - South Weston Road
Infrastructure
Design
$6,200,000 CJ est. value
Weston, WV 26452

Resurfacing - Pricetown-Weston Rd
Infrastructure
Bidding
$900,000 CJ est. value
Weston, WV 26452

Resurfacing - Pricetown-Weston Rd
Infrastructure
Bidding
$900,000 CJ est. value
Weston, WV 26452

Wildlife-Vandalia Boat Ramp Resurface Project
Infrastructure
Post-Bid
Horner, WV

Structure Replacement Freemansburg Arch
Demolition, New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Weston, WV 26452

Highway Pollinator Mitigation Site Development and Maintenance
Term Contract, Infrastructure
Results

Burnsville Road 2
Infrastructure
Results

Jackson's Mill Water Supply and Sanitary/Sewer Improvements
Infrastructure
Construction
$1,800,976 CJ est. value
Weston, WV 26452

Lewis CO 14/6 - BR /CO 3
Infrastructure
Design
$4,070,000 CJ est. value
Weston, WV 26452

Lewis-Gilmer County 911 Call Center & Emergency Management Offices
New Construction, Renovation, Infrastructure - 17,400 SF
Post-Bid
$340,000 CJ est. value
Weston, WV 26452

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

US 19 I/C N and S
Infrastructure
Design
$3,820,746 CJ est. value
Walkersville, WV 26447

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

Last Updated 01/25/2023 07:45 AM
Project Title

Harrison Co Line N and S

Physical Address View project details and contacts
City, State (County) Walkersville, WV 26447   (Lewis County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,589,296 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : NHPP0792291D Type of Work : Replace Br As of January 25, 2023, the project is in Design status. The funding obligation date for the construction is October 28, 2022. WVDOT - Harrison Co Line N and S *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents