Similar Projects
Reported | 04/28/2022 04:18 PM |
Project Title | Bentonville Bikeway Designs - Projects 1B and 3 Interim Striping Plan |
Physical Address | View project details and contacts |
City, State (County) | Bentonville, AR (Benton County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | No Responses Submitted |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bentonville Bikeway Designs-Projects 1B and 3 Interim Striping Plan. Project 1B includes the construction of portions of concrete shared use path and includes the addition of directional separated bikes lanes on NW 3rd Street from Coler Mountain Bike Preserve to NW O Street and a two-way separated bike lane on the north side of NW 3rd Street from NW O Street to NW Walton Boulevard. Project 3 includes the addition of a two-way separated bike lane on the south side of SW 8th Street from the Applegate Trail near SW Arrowhead Drive to SW I Street and the trail that leads to Osage Park. It also incorporated the extension of a shared use path on SW 8th Street from SW Sims Drive to SW Arrowhead Drive to connect to the existing Applegate Trail. Both projects will repurpose the existing street to include an on-street bikeway and have a bike buffer that contains both horizontal and vertical elements. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |