Reported 04/28/2022 04:18 PM
Project Title

Bentonville Bikeway Designs - Projects 1B and 3 Interim Striping Plan

Physical Address View project details and contacts
City, State (County) Bentonville, AR   (Benton County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bentonville Bikeway Designs-Projects 1B and 3 Interim Striping Plan. Project 1B includes the construction of portions of concrete shared use path and includes the addition of directional separated bikes lanes on NW 3rd Street from Coler Mountain Bike Preserve to NW O Street and a two-way separated bike lane on the north side of NW 3rd Street from NW O Street to NW Walton Boulevard. Project 3 includes the addition of a two-way separated bike lane on the south side of SW 8th Street from the Applegate Trail near SW Arrowhead Drive to SW I Street and the trail that leads to Osage Park. It also incorporated the extension of a shared use path on SW 8th Street from SW Sims Drive to SW Arrowhead Drive to connect to the existing Applegate Trail. Both projects will repurpose the existing street to include an on-street bikeway and have a bike buffer that contains both horizontal and vertical elements.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents