Similar Projects
Watershed Pointe / Divide Highway
New Construction, Infrastructure
Conception
$11,700,000 CJ est. value
Little Rock, AR 72212

New District Courts Facility - 2022 Bond - City of Little Rock
New Construction
Conception
$8,500,000 CJ est. value
Little Rock, AR 72201

Contractor - John L. McClellan (JLM) Memorial Veterans Hospital | RAD Room Site Prep, Room 10
Renovation, Infrastructure
Design
$25,000 to $100,000 est. value
Little Rock, AR 72205

Interstate Battery / Sherwood
Addition, Infrastructure - 3,596 SF
Design
$900,000 CJ est. value
Sherwood, AR 72120

ARFF Station Improvements
Renovation, Infrastructure
Bidding
$1,429,100 CJ est. value
Little Rock, AR 72202

Asphalt and Concrete Surface Replacements - 2023
Infrastructure
Bidding
$170,000 CJ est. value
Little Rock, AR 72209

The East End 2021 Water Improvements Contract - 2 Water Line Improvements
Infrastructure
Post-Bid
North Little Rock, AR 72100

Installation of 12inch Diameter Ductile Iron Pipe Crossing I-40 Harris Road
Infrastructure
Post-Bid
Little Rock, AR 72223

2" Galvanized Water Main Replacements
Infrastructure
Results
$2,000,000 est. value
North Little Rock, AR

Fordyce Rural Water System Water Meter Replacement
Alteration
Results
$250,000 est. value
Little Rock, AR

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

River City Hydraulics - Lantrip Road
New Construction, Infrastructure - 8,750 SF
Pending Verification
$2,300,000 CJ est. value
Sherwood, AR 72120

Maverick Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
North Little Rock, AR 72117

The Lofts at Kanis Creek
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Little Rock, AR 72223

Last Updated 07/19/2023 12:52 PM
Project Title

ITO 7 Baseline 21-inch and 24-inch Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Little Rock, AR 72201   (Pulaski County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,511,382 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists generally of rehabilitation of 21-inch and 24-inch gravity sewer main through cured-in-place pipe lining (CIPPL), as well as associated manhole installation and rehabilitation, together with incidental and ancillary work. Generally, the scope of work includes approximately 2,950 L.F. of 21-inch and 6600 L.F. of 24-inch sanitary sewer pipe to be rehabilitated through CIPPL, respectively and approximately 24 manhole rehabilitations. Major requirements associated with this project are mobilization, bypass pumping, manhole rehabilitation, CIPPL rehabilitation, and site restoration together with incidental and ancillary work. Contractor's Bid shall be accompanied by a cashier's check or certified check upon a national or state bank in an amount not less than five (5) percent of the total maximum Bid Price, payable without recourse to the Little Rock Water Reclamation Authority, or a Bid Bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a Contract and execute Performance and Payment Bonds within fifteen (15) days after Notice of Award of Contract. The Notice of Award of Contract shall be given by the Owner within sixty (60) days following the opening of Bids. All bids are subject to the conditions of Section 002113 Information for Bidders of the Contract Documents. The successful Bidder must furnish a Performance Bond and Payment Bond upon the forms provided each in the amount of One Hundred (100) Percent of the Contract Price from an approved surety company holding a permit from the State of Arkansas to act as surety, or other surety or sureties acceptable to the Owner. Attention is also called to the requirements of the DBE/MBE/WBE requirements of the contract documents. The Contractor is required to take the affirmative steps to assure that disadvantaged, minority, and woman business enterprises (DBE/MBE/WBE) are used when possible as sources of materials, supplies, equipment, construction activities, and professional services. The apparent low bidder will, as a condition of contract award, be required to document to the Owner and to the Arkansas Natural Resources Commission that affirmative steps were taken in the preparation of bids to obtain DBE/MBE/WBE participation.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents