Similar Projects
Coliseum Medical Centers Freestanding Emergency Department
New Construction, Infrastructure
Conception
$11,928,250 CJ est. value
Bonaire, GA 31005

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Install Construct Breakroom and Administrative Area Building 125
Addition, Demolition, Renovation, Infrastructure
Bidding
$25,000,000 CJ est. value
Robins AFB, GA 31098

Perry Fieldhouse Site Improvements
Infrastructure
Post-Bid
GA

Water System Improvements Phase II to Serve Gilbert Road
Infrastructure
Post-Bid
$750,000 est. value
GA

Agriculture Meter Installation
Infrastructure
Results

Valve and Meter Boxes
Term Contract
Results
Warner Robins, GA

CRH Healthcare Shell Building / Bonaire
New Construction, Infrastructure - 4,000 SF
Construction
$800,000 CJ est. value
Bonaire, GA 31005

Jack Link's Manufacturing Faculty
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
Perry, GA 31069

RFQ - Downtown Mixed Use Facility
New Construction, Infrastructure
Pending Verification
$5,280,000 CJ est. value
Perry, GA 31069

UHZ113000 Building 231 Second Story Addition
Addition, Demolition, Infrastructure - 20,654 SF
Bidding
$25,000,000 CJ est. value
Robins AFB, GA 31098

Matt Arthur Elementary Parent Drop Off Improvements
Infrastructure
Post-Bid
Kathleen, GA 31047

Site Clearing Of Retention Ponds
Alteration
Results
Warner Robins, GA

RFP Design - Perry DDA Downtown Lot
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Perry, GA 31069

Aquatic Center Site Work
Infrastructure
Results
GA

Last Updated 02/09/2023 01:39 PM
Project Title

Water System Improvements to Serve AE Harris Road

Physical Address View project details and contacts
City, State (County) Perry, GA 31069   (Houston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,400,309 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 9, 2023. The project has been awarded with the amount of $1,400,309.25. The project consists of, but is not limited to, the following major elements: Offeror agrees to furnish all materials and equipment and to perform all labor necessary to install 8,100 LF of 12 PVC water main, 400 LF of 16Ductile Iron water main with restrained joints, jack and bores, fire hydrants, valves, fittings, and all related work.Proposals shall be accompanied by a bid bond or certified cashiers check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an A minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of Bests Key Rating Guide Property Liability. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful offerors if contract is awarded. Each Bond shall be accompanied by a Power of Attorney authorizing the attorneyinfact to bind the surety and certified to include the date of the bond. Preconstruction Conference: February 16, 2023 Time allotted for completion of Work is 150 consecutive calendar days from the date of a written Notice to Proceed from OWNER. All Work shall be completed in accordance with the plans and specifications. Owner reserves the right to reject any or all Proposals, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Proposals and to reject the Proposal of any Offeror if Owner believes that it would not be in the best interest of the Project to make an award to that Offeror, whether because the Proposal is not responsive or the Offeror is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents