Similar Projects
2022 Street Resurfacing
Infrastructure
Bidding
Stonecrest, GA

8.690 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 155 Beginning at the Henry County Line and Extending South to I - 20/SR 402
Infrastructure
Bidding
GA

Rock Chapel Road Paving Project
Post-Bid
$110,000 to $180,000 est. value
Lithonia, GA 30058

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Southern Region Disaster Recovery Support BPA
Results

I-285 / I-20 East Interchange Project
Results
$534,000,000 est. value
GA

Roadway Thermostriping, RPM'S, Painting Crosswalks, Crack Sealing and Seal Coating Asphalt
Infrastructure
Bidding
Conyers, GA

Public Work Services
Post-Bid
Brookhaven, GA

I-285 PIB Interchange Improvements
Results
GA

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Tilly Mill Road Pedestrian and Bicycle Improvements
Results
Less than $1,016,783 est. value
Dunwoody, GA

Roadway, Sidewalk, Right of Way Maintenance and Repair Services
Infrastructure
Post-Bid
Sandy Springs, GA

2020 LMIG Road Resurfacing
Term Contract
Results
GA

T32-D7-PCC Repair-District Wide-130159
Infrastructure
Post-Bid

Sexton Drive Road Repair Project
Results
Stone Mountain, GA 30083

Last Updated 04/13/2022 01:20 PM
Project Title

Ponce de Leon Avenue LCI Streetscape

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30307   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction services along Ponce de Leon Avenue, between Boulevard/Monroe Drive and Freedom Parkway. The scope of work consists of the installation of a new streetscape (sidewalk, ADA ramps, driveway aprons, street trees, lighting, etc.), utility installation and relocation (water meters, water lines, hydrants, storm water inlets, storm water pipes, etc.), traffic signal reconstruction, and a ramp structure and staircase to connect the Ponce de Leon Avenue sidewalk with the Eastside Trail.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents