Reported 07/27/2019 12:00 AM
Project Title

Install New Guard Rail System

Physical Address View project details and contacts
City, State (County) Fort Hood, TX 76543   (Bell County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Set Aside: HUBZone - Description of project is as follows: The purpose of this project is to install a new guard rail system along the perimeter of Building 40001 to provide fall protection to workers and includes the removal and replacement of four (4) existing roof transition steps, two (2) hi-roof ladders , one(1) low-roof ladder and one(1) interior first floor stairway. This includes but is not limited to: abatement of hazardous materials; demolition of walls, sinks, doors and doorways, lighting, HVAC ducts and diffusers; installation of new walls, flooring materials, ceilings, painting, installation of various equipment and plumbing fixtures, lighting, HVAC diffusers/grilles and ductwork, and communications lines. All work shall comply with all State, Local and Federal laws and regulations, industry and construction codes and standards, manufacturer's specifications and recommendations, and all contract special provisions, terms and conditions. The Contractor shall be responsible for obtaining all required licenses and permits to perform construction work on a Federal installation, be properly bonded and insured in accordance with FAR requirements.
Details
Division 02 - Existing Conditions, Hazardous Material Assessment, Demolition, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 09 - Finishes, Painting.
Division 11 - Equipment.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents