Similar Projects
Water Plant
New Construction
Bidding
Crosby, TX 77532

Remote Well Control Panel Replacement
Infrastructure
Bidding
TX

Certification and Calibration of Well Water Meters
Post-Bid
Houston, TX 77072

Air Stripping Tower at Water Well No. 2
Post-Bid
Houston, TX

Manvel Town Center Water Plant
Results
Houston, TX

J045--Reline Main Irrigation Well and Replace Vertical Turbine Pump at Houston National Cemetery. Project Number 851-NRM20-203
Results
$100,000 to $250,000 est. value
Houston, TX

Water Management Maintenance Repair Services
Renovation
Bidding
Houston, TX

Construction of the Remote Well Collection Line to Serve Rosehill Reserve
Post-Bid
TX

Water Plant No. 2
Results
Houston, TX 77002

Construction of Water Plant No. 1 MCC Replacement and SCADA System
New Construction
Post-Bid
Houston, TX 77014

EWPP - Replacement Of Scrubbers
Results
Less than $3,368,680 est. value
Houston, TX

Water Plant No. 1 Well No. 2
Alteration
Post-Bid
TX

Construction of Water Plant No. 1 Rebuild and Water Plant No. 3 Expansion
Results
$5,450,000 est. value
Houston, TX 77084

Water Plant No. 1 Water Well No. 3
Infrastructure
Post-Bid
Houston, TX

Construction of Remote Water Well and Water Plant No. 2 Expansion
Results
$2,991,000 est. value
Humble, TX 77396

Last Updated 03/18/2022 05:49 AM
Project Title

Water Plant Number 2 - Water Well Number 2 Addition

Physical Address View project details and contacts
City, State (County) Cypress, TX 77433   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,803,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes construction of one (1) water well, including vertical turbine pump; motor control center modifications, underground and aboveground conduit and wire, control integration, instrumentation, existing equipment demolition, and service entrance rack modifications; disinfection equipment and modifications; one (1) fiberglass reinforced plastic chemical feed building with foundation; ground storage tank roof modifications; associated electrical, structural, controls, and piping; protective coatings; site improvements including concrete access roadway extension, drainage swales, fencing and gate, and site grading; hydro-mulch seeding; and all additional items shown on the construction plans or needed for a completely functional water plant and water well.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents