Similar Projects
Mountain - Wabeno, Oconto County Line to CTH C
Infrastructure
Bidding
$2,000,000 to $2,999,999 est. value
Crandon, WI 54520

Tomah - Portage, 24th Avenue to Mirror Lake Bridge
Infrastructure
Bidding
$8,000,000 to $8,999,999 est. value
Rock Springs, WI

Concrete Culverts
Post-Bid
WI

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Town of Ithaca, Mcavoy Hill Road, Little Willow Creek Bridge
Results
WI

USH 45, IH 41 / USH 45 Box Culvert; STH 175 and STH 167, Locations on STN Per Plan
Infrastructure
Bidding
$500,000 to $749,999 est. value
West Bend, WI 53090

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

Town of Clayton, Tiller Road, Pigeon Run Creek Bridge, English Run Creek Bridge
Results
Clayton, WI 54004

State Park Road - Culvert Failure
Infrastructure
Bidding
$200,000 est. value
Sherwood, WI 54169

Culverts and Guardrails
Post-Bid
Waukesha, WI

STH 130 - CTH G, Little Bear Creek Bridge
Results
WI

Maintenance Dredging and Culvert Replacement
Infrastructure
Bidding
$600,000 est. value
Columbus, WI

Culvert Materials
Post-Bid
WI

Cassville - Patch Grove, Structures
Results
Cassville, Patch Grove, WI 53806

Last Updated 04/27/2022 06:22 AM
Project Title

150th Avenue/Balsam Branch Culvert Replacement

Physical Address View project details and contacts
City, State (County) Balsam Lake, WI   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $540,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes replacing two 48 concrete culverts with an aluminum arch (box) culvert. With coordination with the Town of Balsam Lake, the road may be closed for up to a week during construction. Flows at this location are generally low and shallow. Silt screen and cofferdams will need to be installed and rearranged periodically during construction phasing. In preparation for installation, the area for culvert placement must be slightly over-excavated for placement of the open graded base. Any removed materials may be placed on the roadway, but must be protected from eroding into the nearby waterway or wetlands.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents