Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Chiller Replacement CBSE Building
Post-Bid
$300,000 to $640,000 est. value
Birmingham, AL 35233

Hawkins Recreation Center Gymnasium HVAC Replacement
Results
Birmingham, AL 35206

Reroofing and HVAC Replacement for Midfield High School
Results
Birmingham, AL

SDB 3rd FL Replace Three Air Handlers
Post-Bid
$300,000 to $350,000 est. value
Birmingham, AL 35233

UAB Spain Wallace AHU - 10 and AHU - 11 Replacement
Results
Birmingham, AL

Humidity Control - UAB Alys Stephens Dressing Room Area
Post-Bid
$125,000 to $150,000 est. value
Birmingham, AL

Western Filter Plant New Pump Building HVAC Replacement
Results
Birmingham, AL

Evaluate HVAC and Power for Mass Spectrometer, THT
Post-Bid
$50,000 to $80,000 est. value
Birmingham, AL 35233

JEFCO Gym HVAC Additions to Adamsville, Bryan, Clay, Pleasant Grove and Snow Rogers Elementary Schools
Results
Gardendale, AL 35071

HVAC and Refrigerant Services
Term Contract
Post-Bid
AL

Heating and Air Contractual Service (HVAC)
Results
Birmingham, AL 35233

MA-ALDOT Statewide HVAC
Term Contract
Post-Bid

UAB North Pavilion 3rd Floor Pharmacy AHU
Results
$550,000 to $650,000 est. value
Birmingham, AL

Kitchen Hood Cleaning - Jefferson County School System
Post-Bid
AL

Last Updated 03/12/2019 08:44 AM
Project Title

Customer Service Center HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The contractor must furnish all labor, tools, equipment and incidentals required to demolish the existing boiler assembly at the BWW Customer Service Center and thereafter assemble and install the new boiler system and upgrade the Johnson Control MetaSys central HVAC system. Moreover, the contractor must also construct and install a roll-up and loading dock.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents