Similar Projects
Morrissey Boulevard Apartments
New Construction - 11,400 SF
Conception
$14,500,000 est. value
Dorchester, MA 02125

North Main Commercial Development
New Construction, Addition - 9,043 SF
Conception
Fall River, MA

36-54 Cambridgepark Drive Residences
New Construction - 328,675 SF
Design
Cambridge, MA 02140

Washington Street Units
Renovation, Addition - 12,000 SF
Design
Dedham, MA

Repairs to Parking Garage - General Bid
Bidding
Less than $450,000 est. value
Fitchburg, MA 01420

Repairs to Parking Garage - Sub Bid
Sub-Bidding
Less than $450,000 est. value
Fitchburg, MA 01420

Belgrade Apartments
New Construction - 40,374 SF
Post-Bid
$7,000,000 to $7,500,000 est. value
West Roxbury, MA 02132

Stockbridge Highway Garage - Filed Sub-Bids
New Construction
Post-Bid
$1,750,000 est. value
Stockbridge, MA

Hamilton Canal Innovation District Parking Garage - General Bids
New Construction
Results
$32,200,000 est. value
Lowell, MA

Ayer Commuter Rail Parking Facility - General Bids
Results
Less than $3,560,000 est. value
Ayer, MA

Cushing Village
New Construction - 461,386 SF
Construction
Belmont, MA 02478

Fenway Center - Mixed Use - Phase I
New Construction - 1,395,000 SF
Construction
$600,000,000 est. value
Boston, MA

10 Damrell Street
New Construction - 105,000 SF
Pending Verification
$10,000,000 CJ est. value
South Boston, MA

Newcomb Street Units
New Construction
Pending Verification
Quincy, MA

Pearl Street Units
New Construction, Demolition
Conception
Newton, MA

Reported 05/22/2020 12:00 AM
Project Title

Ballpark Parking Structure - Filed Sub-Bids

Physical Address View project details and contacts
City, State (County) Worcester, MA   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The project scope generally consists of constructing a new four-level precast concrete parking garage with a capacity of approximately 522 cars on property south of Madison Street on Green Island Boulevard (currently under construction) in Worcester, MA. The proposed parking garage project is located in a former industrial area that is a designated urban development zone. The Project is composed on multiple bid packages, including civil/site enabling work, foundations, precast concrete, architectural finishes, mechanical, electrical, plumbing, fire protection, elevators, etc.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents