Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Carmel Mountain Road Fire Station - San Diego Fire-Rescue Department
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
San Diego, CA 92129

Albertsons #0071 / Valley Center
New Construction, Infrastructure - 50,907 SF
Design
$8,000,000 CJ est. value
Valley Center, CA 92082

Construct Rumble Strips on Both Shoulders, Rehabilitate Bike Path, and Install Fiber Optic Cable/closed Circuit Television (Cctv)
Infrastructure
Design
$7,535,000 CJ est. value
San Diego, CA 92101

Construction On State Highway In San Diego County
Infrastructure
Bidding
$42,000,000 CJ est. value
San Diego, CA 92124

Mid-City and Eastern Area Signal Modifications
Infrastructure
Bidding
$502,000 CJ est. value
San Diego, CA 92101

RFP Construction Manager - Construction Management for Alvarado 2nd Pipeline
Infrastructure
Post-Bid
$350,000 CJ est. value
San Diego, CA 92101

San Diego County Office of Education Campus Security Project
Renovation
Post-Bid
$1,000,000 CJ est. value
San Diego, CA 92111

SDIA - Airport Administration Building - Site Demolition and Earthwork
Infrastructure
Results
San Diego, CA 92108

Bermuda Avenue Coastal Access Replacement
Infrastructure
Results
$2,132,000 CJ est. value
San Diego, CA 92107

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

Nestor Field
Infrastructure
Construction
$122,124 CJ est. value
San Diego, CA 92154

The Trails At Carmel Mountain Ranch
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
San Diego, CA 92101

Aviara Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$125,000,000 CJ est. value
Carlsbad, CA 92011

Bonita Road at Acacia Avenue Drainage - San Diego County
Infrastructure
Conception
$5,925,000 CJ est. value
Bonita, CA 91902

Last Updated 10/19/2022 01:32 PM
Project Title

Whitman Elementary School WSM and JUF (LLB)

Physical Address View project details and contacts
City, State (County) San Diego, CA 92117   (San Diego County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

See attached Invitation to Bid for details of the bidding process. The Prime Contractor Nexgen Building Group, Inc., was previously awarded this contract under solicitation CZ20-0341-23 and is the contractor bidding this project. See contact information above for information related to this bid. Project estimate is between $10 and $11 Million. The anticipated schedule is 18 months beginning in January 2023 and completion in August 2024. The project consists of renovations to existing buildings 01-01, 01-02, 01-03, 01-04, 01-05, 01- 06 and a New Joint Use Field. Online Q&A No Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Submit RFIs via email to Estimating@Nexgenbuilding.com no later than October 6th 2022 at 2:00pm. Final addendum including RFI responses will be issued on October 17th, 2022. Prevailing wage requirements apply to all public works projects and must be followed per Article 17 of the General Conditions of the Request for Proposals. The applicable prevailing wage determination during construction is the one in effect on the date the GMP is first published in a newspaper of general circulation. Here, the applicable prevailing wage determination for construction services referenced in the published GMP advertisement is 2022- 2. The first bid advertisement date for each District defined GMP phase shall establish the applicable prevailing wage determination, regardless of how many times the Prime Contractor published an advertisement. That first bid advertisement to subcontractors shall state the applicable prevailing wage determination for construction services for the duration of that District defined GMP phase. Each District defined GMP phase for construction services may have a different prevailing wage determination based on its separate publication of the first bid advertisement date. The following is a link to the Department of Industrial Relations (DIR) website to obtain rate information, and any applicable predetermine increases Documents available electronically. Pursuant to resolution in support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, Nexgen Building Group, Inc. is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this program, the bidder shall satisfy all requirements enumerated in the bid package. GOALS FOR EBE & DVBE PARTICIPATION: 50% EBE / 6% DVBE. Prequalifications are due by October 6th 2022 at 2:00pm. Every subcontractor to the Contractor seeking to perform work on this bid, regardless of trade, tier, or value of the work, is required to be prequalified with the District. Bids will not be accepted from non-prequalified subcontractors. Visit sandiegounified.org/contractor-prequalification or email prequal@sandi.net for more information. MEP (Mechanical/Electrical/Plumbing): Subcontractors performing work under one or more of the following license classifications, including any contractor holding A or B licenses and/or performing work of C-4, C-7, C-10, C-16, C-20, C34, C-36, C-38, C-42, C-43 and C-46, should submit their prequalification application on electronically . Go to tinyurl.com/SDUSD-PlanetBids, login as a vendor, then click the menu on the left, and select prequalification to get started. MEP prequalifications must be renewed annually on the approval anniversary. NON-MEP: Each Non-MEP contractor should submit a Non-MEP subcontractor prequalification application at sandiegounified.org/non-mep. Non-MEP prequalifications must be renewed annually every February. The general contractor reserves the right to award bid packages as a combination or as a single package. Subcontracts shall be awarded, if awarded at all, by general contractor on a best value basis. Bids will be reviewed and evaluated for completeness of scope coverage and awarded to the subcontractor who is deemed the best value for the project as a whole. The General Contractor reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding process. No bidder may withdraw his bid for a period of 120 days after the date set for the opening of bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents