Similar Projects
Happy Hollow Park and Zoo Lower Zoo Electrical Improvements - City of San Jose
Alteration
Conception
San Jose, CA

Police Athletic League Stadium Electrical Improvements - City of San Jose
Renovation, Infrastructure
Conception
$2,220,000 est. value
San Jose, CA 95116

West Valley College SIE Audio Visual Project
Renovation
Sub-Bidding
$756,900 CJ est. value
Saratoga, CA 95070

Electrical Contractor
Term Contract
Sub-Bidding
Santa Clara, CA 95050

Nurse Call Project
Term Contract
Post-Bid
San Jose, CA 95113

Uninterruptible Power Supply Monitoring, On-Site Services, and as Required Battery and Network Management Cards
Alteration
Post-Bid
San Jose, CA

Cubberley New Electrical Service
Alteration
Results
$200,000 est. value
Palo Alto, CA 94303

Santa Clara Conduit Rehabilitation and Pacheco Sectionalizing Valve Replacement Project
Infrastructure, Alteration
Results
$7,000,000 to $9,000,000 est. value
San Jose, CA

LED Exterior Lighting Upgrades for VTA's Cerone and River Oaks Campuses
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
San Jose, CA 95112

Renewable Energy and Storage
Alteration
Post-Bid
Palo Alto, CA

Bus Yard, Electric Vehicle (EV) Charger Station Installation
Alteration
Results
$100,000 est. value
Palo Alto, CA 94301

Electrical Services
Term Contract
Post-Bid
Gilroy, CA 95020

Cubberley A and B Wings Installation of New Electrical Sub Panels
Alteration
Results
$60,000 est. value
Palo Alto, CA 94306

129 RQW - Install Generators and ATSs at Building 663 and 683
Renovation
Post-Bid
$100,000 CJ est. value
Moffett Field, CA 94035

Adobe Creek 20 Load Tap Changer (LTC) Refurbish
Alteration
Results
$30,000 est. value
Palo Alto, CA

Last Updated 10/10/2023 04:52 PM
Project Title

Renaissance at Fischer Locker Installation

Physical Address View project details and contacts
City, State (County) San Jose, CA 95122   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of all labor, materials equipment, and services necessary to Remove and Replace Lockers and install storage enclosure metal mesh/door and convex mirrors at FISCHER MS Bidders must submit with their Bids a cashiers check or a certified check payable to District, or a bid bond by an admitted surety insurer of not less than ten percent (10%) of amount of base Bid, plus all additive alternates (Bid Bond). The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations and to possess one or more of the following State of California Contractor Licenses: A, B The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. Pursuant to Government Code section 53069.85, Contractor shall pay to the District, as fixed and liquidated damages for these incalculable damages, the sum of two-hundred fifty dollars ($250.00) per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule, construction schedule, or project milestones established pursuant to the Contract. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to Michael Blaz, Construction Manager at michael.blaz@sixthdimensionpm.com. Construction Contracts Over $60,000 and Less Than $200,000) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. . Questions received less than SEVEN (7) calendar days prior to the date for opening Bids may not be answered.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents