Similar Projects
Rolling Hills New Building Facilities
New Construction
Conception
$42,000,000 est. value
Byesville, OH

Rolling Hills New Building Facilities
New Construction
Conception
$42,000,000 est. value
Byesville, OH

New Elementary School
New Construction
Design
$36,000,000 est. value
Millbury, Uniontown, OH 43447

New Elementary School
New Construction
Design
$36,000,000 est. value
Millbury, Uniontown, OH 43447

New Lebanon Schools Baseball Building
New Construction - 2,020 SF
Bidding
$220,000 est. value
New Lebanon, OH

Design Professional Services
Renovation
Bidding
Dublin, OH

Firelands High School
New Construction - 106,643 SF
Post-Bid
$23,000,000 est. value
South Amherst, OH 44001

Construction of A Story Early Learning Center
New Construction - 40,000 SF
Post-Bid
Less than $10,100,000 est. value
Cincinnati, OH 45231

New K-6 and 7-12 Building Construction
Results
Cincinnati, OH

Green Local School District: New Pk-12 Facility
New Construction - 87,881 SF
Results
Less than $19,698,611 est. value
Franklin Furnace, OH 45629

St. Martin de Porres High School - Phase II
New Construction - 25,000 SF
Construction
$8,279,000 est. value
Cleveland, OH 44103

Indian Creek New High School and New Elementary School
New Construction
Construction
Less than $51,303,498 est. value
Wintersville, OH

Medina Christian Academy Expansion - Master Plan
Addition
Pending Verification
Medina, OH 44256

Greater Dayton School - Private PK-8 Elementary School
New Construction
Conception
$35,000,000 est. value
Dayton, OH 45402

Tusky Valley PK-6 Middle School Conversion
Renovation, Addition - 101,215 SF
Design
$17,700,000 est. value
Bolivar, Zoar, OH 44612

Last Updated 10/26/2021 04:55 PM
Project Title

Antwerp LSD Innovation Center New Construction

Physical Address View project details and contacts
City, State (County) Antwerp, OH   (Paulding County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,539,950
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Construction: General construction work consists of, but not limited to: Demolition of existing exterior slab, plaster soffit, and openings in existing wall construction. Construction of new exterior metal stud walls with metal panel and thin brick panel system, storefront, and membrane roofing. New interior concrete slab on new and existing foundations. Metal stud and gypsum board interior partitions; doors, door frames and hardware; acoustical ceiling tiles and grid; cabinets and casework, furniture, floor coverings, painting of walls and overhead structure, graphic paint, acoustical wall panels, interior signage and other related work. Greenhouse and associated foundation, slab and other related work. Site Work: Site work consists of, but not limited to: Earthwork/grading, storm and sanitary utilities, concrete, flush concrete curbs, paver work, modular block retaining wall, gravel, landscaping/plantings, seeding and demolition of some existing site items Fire Protection Work: Fire protection work consists of, but not limited to: extension of an existing fire suppression system zone and new hydraulic calculations for zone. Verify existing size, type and location on site. Plumbing Work: Plumbing work consists of, but not limited to: Extending existing domestic hot and cold water, gas piping and new sanitary for various new plumbing fixtures including service sinks, wash fountain with solids interceptor, emergency eye/face wash, wall hydrants, and floor drains as well as a reduced pressure backflow preventer, hose bibbs, swamp cooler connections, trench drain and floor sink in the greenhouse. HVAC Work: HVAC work consists of, but not limited to: four new fan coil units with supply and return ductwork, diffusers, associated hydronic piping tieing into existing systems, and associated air transfers. Exhaust fans and associated backdraft dampers and ductwork to roof hood. Exhaust and outdoor air ductwork to existing ERU. Rebalancing of existing energy recovery unit. Balancing of new HVAC system and integration of controls into existing BAS system. Electrical Work: Electrical work consists of, but not limited to, demolition of power, lighting devices and light fixtures. New work consists of fire alarm, power to receptacles and mechanical equipment. New LED lighting controlled by occupancy sensors and low voltage switches. Technology Work: Technology work consists of, but not limited to. The installation and configuration of paging equipment. installation of network cabling, faceplates, patch panels.

Details

Middle/Senior High School, New Construction, Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents