Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Old Upper Mountain Road Site Environmental Remediation
Infrastructure
Bidding
$20,000,000 to $30,000,000 est. value
Lockport, NY 14094

Demolition and Site Restoration at Orange County Transfer Station 2
Demolition, Infrastructure
Bidding
Newburgh, NY 12550

Beechwood Avenue Organic Yard Site Development
Post-Bid
New Rochelle, NY 10801

Trenching/Excavatioin and Backfill Services
Term Contract
Post-Bid
Poughkeepsie, NY 12601

East Gym Fit Court Site Work and Lighting
Results
Binghamton, NY 13902

2019 CIP Phase 1 - Site Preparation
Results
Sodus, NY 14551

Maria College Campus Development
Renovation, Addition - 1,120 SF
Construction
$5,000,000 est. value
Albany, NY 12208

Daisy Barn Campground
New Construction
Construction
$1,600,000 est. value
Wilson, NY 14172

Alcove Facilities Upgrades and Site Improvements
New Construction, Renovation, Infrastructure
Bidding
Alcove, Coeymans Hollow, NY 12007

Trail 4 Improvements To The Nysdec West Almond Trail System 2021
Renovation
Post-Bid
Almond, NY 14804

Chili Fire Department Company 1 - Sitework
Results
Rochester, NY 14624

Aldi-McDonald's Pad Site
New Construction
Construction
Greenport, NY 12205

Excavating and Backfilling Construction Holes
Term Contract
Bidding
Great River, NY

Horizontal Directional Drilling - Term Construction Contract #6
Post-Bid
Rochester, NY

Last Updated 03/22/2022 12:20 PM
Project Title

Area No. 2 Restoration

Physical Address View project details and contacts
City, State (County) NY   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the furnishing of all labor, plant, tools, equipment and specified materials or services Area No. 2 Restoration, April 1, 2022 through March 31, 2024. The Work consists of asphalt, lawn, and concrete restoration resulting from emergency maintenance repair work arising out of excavation and other work performed by the Erie County Water Authority.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 31 - Earthwork, Grading, Excavation and Fill, Excavation, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents