Similar Projects
Upgrade to Potable Water Risers Construction
Alteration
Design
$1,000,000 to $5,000,000 est. value
Iron Mountain, MI 49801

MDOT Warehouse Air Handling Unit 9 Replacement
Alteration
Bidding
Dimondale, MI 48821

AC/Heating
Post-Bid
Marshall, MI 49068

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

Replace HVAC System - Lottery Building
Results
Lansing, MI 48909

St. Louis Correctional Facility - Various HVAC Upgrades
Results
Saint Louis, MI

LHS York 300 Ton Chiller
Post-Bid
Battle Creek, MI 49015

Z1DA--585-18-117 Upgrade Outbuilding Heating System
Results
$100,000 to $250,000 est. value
Iron Mountain, MI 49801

Elmwood Chiller Replacement
Post-Bid
Lansing, MI 48917

41--HVAC Condenser and Coil
Results
Alpena, MI 497078172

HVAC at Battle Creek Transit
Post-Bid
Battle Creek, MI

Township Hall Boiler Replacement
Results
Dewitt, MI

Heating System Annual Inspection & Preventative Maintenance for Coast Guard Housing Cheboygan Michigan
Post-Bid
Cheboygan, MI

Washington Street Elementary HVAC Improvements
Results
Otsego, MI 49078

HVAC and Mechanical Products
Term Contract
Post-Bid

Reported 03/18/2022 12:00 AM
Project Title

Standish Community Center RTU Replacement

Physical Address View project details and contacts
City, State (County) Standish, MI   (Arenac County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To seek service of a qualified professional mechanical contractor to provide construction services to the Standish – Sterling Community School District for the replacement of a Roof Top Unit. Services will include the design, disconnect, demolition and replacement of the existing Community Center roof top unit. This is to be a turn key replacement and should include training on how to operate the RTU after installation. Control of the new unit shall communicate with the existing environmental operation system. Reuse of existing wiring/devices will be allowed provided the meet current electrical code standards.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents