Reported | 05/25/2022 12:00 AM |
Project Title | Boone Street Paving, Drainage, and Utility Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Terrell, TX 75160 (Kaufman County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $620,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Boone Street Paving, Drainage, and Utility Reconstruction Establish and remove offices, plants, and facilities. Move personnel, equipment, and suppliesto and from the project or the vicinity of the projectsite to begin work or complete work on contract items. Thisitem includesthe cost of bonds, insurance, any other costs notspecifically designated and called for in the contract bid proposal. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $250.00 for each day that expires after the time specified in Paragraph 4.02 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $250.00 for each day that expires after the time specified in Paragraph 4.02 above for completion and readiness for final payment until the Work is completed and ready for final payment. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |