Similar Projects
Public Safety Center Construction
Addition
Conception
Patterson, CA 95363

Public Works Building - Seismic Upgrade
Renovation
Conception
$925,674 est. value
Glendora, CA 91741

Hale Building Interior Remodel
Renovation
Design
$3,500,000 est. value
Pasadena, CA 91101

City Hall Office Improvements
Renovation
Bidding
$80,000 est. value
Ontario, CA 91764

El Capitan State Beach Entrance Improvements
Renovation
Bidding
$4,600,000 est. value
Santa Barbara, CA 93101

Hall of Administration Seismic Retrofit Project Management/Construction Management
New Construction, Infrastructure - 960,000 SF
Post-Bid
$9,000,000 est. value
Los Angeles, CA 90012

Fire Department City Hall Tenant Improvement
Renovation
Post-Bid
$5,000,000 est. value
Salinas, CA

Tenant Improvements At Civic Center Building 1
Renovation
Results
Atwater, CA 95301

Restroom Remodel For City Hall Building
Renovation
Results
$70,000 est. value
Duarte, CA 91008

Sacramento County Courthouse
New Construction - 566,895 SF
Construction
$500,000,000 est. value
Sacramento, CA

Gas Station, Car Wash, Convenience Store
New Construction - 8,262 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Napa, CA 94559

Architectural Design Services of the City Hall East Wing
Renovation
Post-Bid
Whittier, CA 90602

Development Services Lobby Renovations
Renovation
Results
$950,000 est. value
Palm Desert, CA 92260

Corporation Yard Improvement Project - Phase 1
Renovation
Post-Bid
$1,000,000 est. value
Half Moon Bay, CA 94019

Council Chamber Renovations
Renovation - 6,606 SF
Results
$900,000 to $1,100,000 est. value
Palm Desert, CA 92260

Reported 05/20/2022 08:16 AM
Project Title

RFQ Contractor - Fire Life Safety Egress System Upgrade Project

Physical Address View project details and contacts
City, State (County) El Cajon, CA 92020   (San Diego County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $13,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is a fire, life, and safety egress system upgrade project occurring throughout the interior tenant floors, and some peripheral exterior areas, of the Courthouse. The Project involves upgrading the stair pressurization system to stairwells 1, 2, 3, 4, 15, and 16. All upgrades will comply with accessibility requirements, and will include work on lighting, and miscellaneous mechanical, electrical, and plumbing ("MEP")items throughout the Courthouse. The Project will involve the installation of forty-nine (49) new vestibules at the pressurized stairways, two new two-hour passageways, as well as upgrades to the interior spaces of the Courthouse, including lighting, signage, and miscellaneous MEP items as required forthe major circulation area on every floor. A new telescoping secured vehicular gate at the sheriff's parking area and fencing and exit discharge components will be upgraded to support the secure parking area.This is meant as a general description of the scope of work for the Project. Final plans and specifications will be issued with the Project Manual for the Project.

Details

Capitol/Court House/City Hall, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents