Similar Projects
Outside Contracted Services
Bidding
Arlington, TX

UPS Maintenance
Post-Bid
Fort Worth, TX 75050

2020 Generator Installation Richland High School
Post-Bid
$100,000 est. value
North Richland Hills, TX 76180

Gym Lighting Retrofit at Richland High School and Haltom High School
Results
$102,309 est. value
Haltom City, North Richland Hills, TX 76137

Total Campus Energy Optimization Program
Results
$518,274 est. value
Kennedale, TX 76060

Sources Sought - Eaton UPS Replacement
Post-Bid
Fort Worth, TX

Annual Requirements Contract for Emergency Generator Maintenance and Repairs
Term Contract
Results
Arlington, TX

Electrical Services and Repairs
Term Contract
Post-Bid
Keller, TX 76244

Conduit Repair and Replacement
Term Contract
Results

Maintenance of UPS Systems, Lighting Inverters and Direct Current Power Plants
Post-Bid
Fort Worth, TX 76102

North Main Bridge - LED Lighting
Results
$377,006 est. value
Mansfield, TX 76063

Electrical Services
Post-Bid
Fort Worth, TX 76100

Annual Contract for Specialized Electrical Services
Term Contract
Results
Fort Worth, TX 76100

Village Creek Water Reclamation Facility Phase II Electrical Improvements
Post-Bid
Fort Worth, TX 76102

Generator Maintenance and Repair
Term Contract
Results
Fort Worth, TX 76102

Reported 11/25/2020 11:27 AM
Project Title

Replace Switchgear and Medium Voltage Distribution Equipment

Physical Address View project details and contacts
City, State (County) Fort Worth, TX   (Tarrant County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

FMC Fort Worth is a federal correctional facility located at 3150 Horton Road, Fort Worth, Texas 76119. The project consists of furnishing all equipment, materials, labor, testing, training etc. for the complete construction of the work. Base Bid: The work includes replacement of medium voltage switchgear and distribution equipment to include, but not limited to, an 600 SF building to include foundations, superstructure, exterior enclosure, roofing, HVAC, and electrical. Replace existing pad-mounted switches and concrete pads. Replace existing pad-mounted transformers. Option #1 The work will consist of replacement of existing medium voltage underground cabling throughout much of the facility, while retaining existing concrete-encased ductbanks and manholes.

Details

Division 26 - Electrical, Medium-Voltage Switchgear.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents