Similar Projects
Murphy USA #7306 / Muncie
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Muncie, IN 47305

Replace Superstructure - I 69
Demolition, New Construction, Infrastructure
Design
$4,454,000 CJ est. value
Yorktown, IN 47396

Operation and Maintenance of the Town Hall Park Concession Stand and Splash Pad
Renovation
Post-Bid
Albany, IN

Renovations and Additions to West View Elementary
Renovation, Addition
Post-Bid
$9,000,000 est. value
Muncie, IN 47304

Brown Family Amphitheater
New Construction - 2,185 SF
Results
$3,300,000 est. value
Muncie, IN

Mcculloch Park Lodge Restoration
Renovation
Results
Muncie, IN 47303

Discovery Park Expansion - Muncie Childrens Museum
Addition, Demolition, Infrastructure
Pending Verification
$350,000 CJ est. value
Muncie, IN 47305

RNR Tire Express Expansion
Addition, New Construction, Infrastructure
Pending Verification
$120,000 CJ est. value
Muncie, IN 47303

Project 2021 G.O.B. High School Site Improvements
Infrastructure
Post-Bid
$2,000,000 est. value
Muncie, IN 47303

East Mall Phase 4 Site Improvements
Infrastructure
Results
$507,377 est. value
Muncie, IN 47303

Project Greathouse
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Muncie, IN 47302

South View Elementary School Renovation
Renovation
Post-Bid
$600,000 est. value
Muncie, IN 47302

Orphan Wells - Delaware, Henry, and Madison Counties
Infrastructure
Results
$472,312 CJ est. value
Muncie, IN 47305

Bridge Rehab - Pipe Lining - Indiana Department of Transportation
Infrastructure
Pending Verification
$437,930 CJ est. value
Muncie, IN 47304

Parking Lot Resurfacing at Earthstone Terrace and Southern Pines
Infrastructure
Post-Bid
$200,000 CJ est. value
Muncie, IN 47305

Last Updated 04/13/2023 12:10 PM
Project Title

Wes-Del Athletics Phase 1 Track-Football

Physical Address View project details and contacts
City, State (County) Gaston, IN 47342   (Delaware County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Security shall be in the amount of not less than five percent (5%) of the total price and delivered in a sealed envelope showing the Bidder's name and address Bidder receiving the award shall furnish an approved one hundred percent (100%) Performance Bond and a one hundred percent (100%) Labor and Materials Payment Bond which cover faithful performance of the Contract and the payment of all obligations arising thereunder. Said bonds shall remain in full force and effect for twelve (12) months from the date of acceptance of the Work.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents