Similar Projects
Unit Upgrades, 48 Fairbank Circle 705-4
Bidding
$40,000 est. value
Sudbury, MA

On-Call Tub Refinishing Repairs
Bidding
$20,000 est. value
Lowell, MA

Weston Manor Shower Surrounds Installation
Post-Bid
Less than $75,000 est. value
Somerville, MA 02145

Shower Surround Installations at Various Developments
Post-Bid
Less than $99,000 est. value
Somerville, MA 02145

Crocker Hall Interior Renovations Phase 1 - General Bids
Results
Less than $660,000 est. value
Framingham, MA

Moisture Remediation Repairs
Results
$50,000 to $150,000 est. value
Framingham, MA 01701

Office Renovations Hale Middle School
Bidding
$80,000 est. value
Stow, MA 01775

Bryant Manor Shower Surrounds Installation
Post-Bid
Less than $95,000 est. value
Somerville, MA 02145

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

Ceiling Tiles Removal and Replacement
Bidding
$515,000 est. value
Wilmington, MA 01887

Alterations for Buildings and Grounds at Farley - Filed Sub-Bids
Post-Bid
Framingham, MA 01702

Costello Basketball Suite Project - Filed Sub-Bids
Results
$3,000,000 est. value
Lowell, MA

Belmont Fire Department Headquarters Interior Repairs
Post-Bid
Less than $50,000 est. value
Belmont, MA 02478

Central Acton Water Treatment Plant Contract 1 - Filed Sub-Bids
Results
$6,800,000 est. value
Acton, MA 01720

Shower Surrounds Installation at Ciampa Manor
Post-Bid
Less than $99,000 est. value
Somerville, MA 02145

Reported 02/15/2020 12:00 AM
Project Title

Access Control Partitions

Physical Address View project details and contacts
City, State (County) Natick, MA 01760   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General Requirements. The contractor's primary focus shall be to: (1) Fabricate and deliver all required modular panels and hardware such that DEPT can install access control partitions in S-128 in Natick, Massachusetts. (2) Provide custom sized panels to accommodate specific parameters of S-128 layout. Site visit(s) can be conducted. b. Specific Requirements: (1) 154 Linear Feet of 4’ wide x 9’ tall x 3” thick prefabricated walls (2) Post systems shall be anodized aluminum. (3) Shall be modular and reconfigurable in nature (4) Custom panels fabricated to accommodate location specific layouts (5) Shall include all required corner posts, wall anchors, top caps, and hardware for fastening to concrete floor. (6) Walls exterior shall be comprised of grey painted steel (7) 11x panels shall include tempered safety glass windows through the mid section (8) 3x sets of 20ga. steel double doors with mounting hardware shall be included accommodated within the panel design scheme. (9) Steel double doors shall include 23”x29” tempered safety glass windows. (10) Steel double doors shall accommodate SIMPLEX 1000 SERIES locksets (11) Steel double doors shall include panic bar hardware on inside faces. (12) Panels shall interface with Porta-King Versaking 3” wall system. (13) Layout shall accommodate the configuration attached.

Details

Division 09 - Finishes.
Division 10 - Specialties, Partitions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents