Similar Projects
Reported | 11/08/2019 12:00 AM |
Project Title | Volker Hall, 5th Floor, Air Handler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35233 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | $210,000 to $245,000 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is a maintenance air handler replacement project. The existing air handler serving the 5,h floor of the Volker Tower is beyond its service life and shall be replaced. The work shall involve, but not be limited to, an air handler demolition, demolition and new work involving the air handler concrete equipment pad, coatings for the mechanical room floor and walls, a temporary supply air system, a new air handler installation, chilled water piping demolition and installation, miscellaneous piping work due to interferences, electrical power circuits for the new air handler, and, a Siemens DDC control system for the new equipment. The spaces this air handler serves shall be occupied during the time of the demolition and construction work. Work shall proceed in a manner to minimize the onsite demolition and construction time. Work shall also proceed in a manner so as not to interfere with the occupants of the floor. The time involved in switching from the existing system, to the temporary system and to the new system shall occur in a manner to minimize the time the areas served are not without conditioned air. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |