Similar Projects
RFP - On-Call Environmental Engineering and Hazardous Materials Testing, Consulting
Term Contract
Conception
Berlin, CT 06037

Recycling Center Modernization - Town of West Hartford
Renovation
Conception
$1,750,000 CJ est. value
West Hartford, CT 06110

King Street Distribution and Flex Buildings
New Construction - 600,350 SF
Design
Enfield, CT

USACE Philadelphia District-wide SRM MATOC
New Construction
Design
$25,000,000 to $100,000,000 est. value
Philadelphia, PA 19107

RFQ - Task Order Consultant Services for Highway Design
Term Contract
Bidding
$5,000,000 CJ est. value
Newington, CT 06111

RFP - Broadband Consultant for Professional Services
Term Contract
Bidding
New Britain, CT 06051

Custodial services at 450 Columbus Boulevard
Term Contract
Sub-Bidding
Hartford, CT 06103

Custodial Services at 505 Hudson Street and 110 Sherman Street
Term Contract
Sub-Bidding
Hartford, CT 06103

Crumbling Foundations - Remediation Services For Concrete
Term Contract
Post-Bid
Hartford, CT 06106

Crumbling Foundations - Materials Testing and Lab Analysis
Term Contract
Post-Bid
Hartford, CT 06106

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Renovations at Bristol City Hall
Renovation
Construction
Bristol, CT 06010

RFQ - Plan of Conservation and Development Review and Update
Term Contract
Bidding
South Windsor, CT 06074

Jefferson Square Building Mechanical and Electrical Condition Assessment
Term Contract
Sub-Bidding
West Hartford, CT 06107

Last Updated 08/10/2022 02:37 AM
Project Title

RFP - Task Order Environmental Soil and Groundwater Services

Physical Address View project details and contacts
City, State (County) Newington, CT 06111   (Hartford County)
Category(s) Government/Public, Professional Services
Sub-Category(s) Inspection Services, Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Connecticut Department of Transportation (Department) is seeking to engage two (2) consultant firms to provide environmental soil and groundwater task order services and one (1) consultant firm to provide environmental compliance asbestos, lead, air quality and structure demolition compliance services. Firms are eligible to pursue and be selected for both assignments; however, each assignment requires a separate submittal as detailed below. Each assignment selection will be determined by a separate interview process. These assignments are medium complexity for volume considerations. Environmental Soil and Groundwater services include but are not limited to: regulatory compliance, environmental site evaluations, subsurface environmental investigations, water quality monitoring, design of soil and groundwater remediation systems, sampling and screening for storm sewer illicit discharge detection and elimination, preparation of plans, specifications and estimates, and environmental inspection and compliance services. Firms responding to this request should be of adequate size and sufficiently staffed and experienced to perform this assignment and will be required to provide the necessary staffing upon execution of the contract. The selected firms will also be required to maintain a Connecticut office for the duration of assignment, with the Project Manager available on a daily basis for the direct and visual supervision of the staff performing the majority of the assignments. Please be advised that there is no Disadvantaged Business Enterprise (DBE) goal assigned for these contracts. All firms are advised that the prime consultant must perform the majority of the work with employees of the firm. Joint venturing will not be allowed. Small-, Minority- and Women-owned businesses are encouraged to provide submittals. The Department, in its sole discretion, reserves the right to cancel this solicitation and terminate the process to retain consultant services, and is under no obligation to contract for the services specified herein. The Department, in its sole discretion, reserves the right to award subsequent phases of an assignment to other qualified firms. All inquiries regarding this request for letters-of-interest shall be directed to Ms. Amie Maines of the Consultant Selection Office at (860) 594-3346 or the email listed above. You will receive a confirmation email by 4:00 p.m. on the due date, once your submittal has been accepted. Please retain proof of sending your submission before the due date/time, in the unlikely event that your email is not received. If you do not receive a confirmation by the time specified above, please contact the Consultant Selection Office at 860-594-3498 or at the email listed above. Firms, who are shortlisted based on their CSO 255 submittal, will be notified by the Consultant Selection Office of the time and date for their final selection interview. A final selection is anticipated by September 30, 2022. The Method of Contractor Selection has not been determined at this time. CTDOT - RFP - Task Order Environmental Soil and Groundwater Services

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents