Similar Projects
Primate Center Chilled Water Extension - GPC
Infrastructure
Bidding
$2,130,800 est. value
Madison, WI 53774

Primate Center Chilled Water Extension - MEP
Infrastructure
Bidding
$2,130,800 est. value
Madison, WI 53774

Cold Water Fire Service Meters
Term Contract
Post-Bid
Milwaukee, WI 53202

Storm Main Repair
Post-Bid
Tomah, WI

2020 Utility Replacements
New Construction, Renovation
Results
Sturgeon Bay, WI 54235

Tanager Street Extension
Renovation
Results
Waupun, WI 53963

LSL (Private Lead Water Service Line Replacement)
Infrastructure
Bidding
Cadott, WI

Manhattan Drive Water Main Replacement
Post-Bid
$395,000 est. value
Menomonee Falls, WI 53051

County Line Road Sanitary Sewer and Water Main Conversion
Results
$1,800,000 to $2,100,000 est. value
Menomonee Falls, WI 53051

Windsor Crossing, Village Center Phase II
Infrastructure
Bidding
Windsor, WI

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Green Stormwater Infrastructure Improvements Barkers Island Marina
Post-Bid
Superior, WI 54880

Perry to Newman 36-Inch Transmission Water Main
Results
Less than $11,000,000 est. value
Racine, WI 53406

Private Sewer and Water Service Replacement West Street
Post-Bid
$150,000 est. value
Beaver Dam, WI 53916

Last Updated 07/22/2021 09:26 AM
Project Title

Water Main Extension

Physical Address View project details and contacts
City, State (County) Kenosha, WI 53142   (Kenosha County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of 16-inch and 24-inch diameter potable water main along 128th Avenue, 60th Street (CTH K), and 122nd Avenue, including valves, fire hydrants, and other appurtenances. Work includes horizontal directional drilling of the water main beneath 60th Street (CTH K) and 122nd Avenue. Also included is asphalt pavement replacement and milling and overlay on 128th Avenue, minor concrete sidewalk replacement at 60th Street and 122nd Avenue, site erosion control, traffic control, clearing and grubbing, and site restoration. Total project length is approximately 1.8 miles.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents