Similar Projects
Reported | 05/15/2019 12:00 AM |
Project Title | 2018-2019 Water Distribution System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Grand Blanc, MI (Genesee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of constructing an 8-inch water main loop between the existing water mains at Trillium Theater and Laird Technologies, extending the 12-inch water main along the southwest side of Saginaw Road from Pepperwood Drive to the City of Grand Blanc Limits, and the construction of a 12-inch water main loop along Saginaw Road from the existing water main at Woodfield Parkway to the existing water main at Dixie Lodge. The project work includes open cut water main installation, bore and jack water main installation, and restoration. Principal items of work include but are not limited to: 3,485 Ft 12 inch Water Main, Open Cut 435 Ft 12 inch Water Main, Bored 225 Ft 8 inch Water Main, Open Cut 85 Ft 8 inch Water Main, Bored | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |