Similar Projects
Reported | 06/13/2020 12:00 AM |
Project Title | Bike-Skills Trails Park Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Orem, UT 84057 (Utah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | If built according to design, Phase 2 trails system is approximately 2,748 linear ft. The intermediate loop with road connector trail, shown in red, is approximately 2,154 linear ft. The advanced line, shown in yellow, is approximately 594 linear ft. The estimated distances were determined using an aerial image and include the elevation profile of the area; actual distances may differ slightly. Contractor will be responsible to layout and design the new trail system. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |