Similar Projects
Mcalister HVAC Replacements
Alteration
Bidding
$300,000 est. value
Waukegan, IL 60085

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

2020 HVAC Preventative Maintenance Services
Term Contract
Post-Bid
Fox Lake, IL

Building 310 Exhaust Fan
Results
Gurnee, IL

2021 HVAC Upgrades Diamond Lake School
Results
Mundelein, IL

HVAC and Mechanical Products
Term Contract
Post-Bid

Leisure Center HVAC Roof-Top Unit
Results
Zion, IL 60099

2021 HVAC Upgrades at Antioch Community HS
Post-Bid
Lake Villa, IL

Mechanical HVAC System Replacement
Results
Wauconda, IL 60084

2021 Rooftop Unit Replacement
Post-Bid
Antioch, IL 60002

Station 2 HVAC
Alteration
Results
Vernon Hills, IL 60061

Rooftop Solar Panel Installation and Operations
Post-Bid
Highland Park, IL 60035

HVAC Maintenance for the City of Lake Forest and the Village of Glenview
Alteration
Results
Lake Forest, IL

2021 HVAC Improvements at Rondout ES
Post-Bid
Lake Forest, IL 60045

Advanced Technology Center HVAC
Alteration
Results
Grayslake, IL

Last Updated 05/03/2022 09:23 AM
Project Title

Replace Greenhouse Homes HVAC

Physical Address View project details and contacts
City, State (County) North Chicago, IL 60064   (Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This construction project is required to have a contractor provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project, including erection of temporary enclosures preventing the release of dust outside of the work area, selective demolition, metal studs, gypsum wall board, paint, ceilings, and flooring, electrical power and light, new HVAC systems serving the four buildings, modifications to the fire protection and alarm system, telecom cabling, and other work to affect a complete turn-key spaces supporting described clinical function(s) and equipment. This project replaces the existing HVAC systems for four single-story housing buildings. All four buildings share nearly identical floor plans with minor variations. New HVAC systems include new ductwork, AHU s, boilers, pumps, steam generators, and controls. Work will be performed on one building at a time, with up 30 days between buildings to allow for relocation of occupants. Relocation of occupants in first building will begin after NTP.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents