Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Newport Beach Junior Lifeguard Building Project
New Construction, Infrastructure
Bidding
$4,800,000 CJ est. value
Newport Beach, CA 92663

Newport Beach Junior Lifeguard Building Project
New Construction, Infrastructure
Bidding
$4,800,000 CJ est. value
Newport Beach, CA 92663

Install Iron Fence and Modify Landscape and Irrigation Facilities
Infrastructure
Sub-Bidding
$1,870,000 CJ est. value
Tustin, CA 92780

38th Street Park and San Miguel Park Fencing Project
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Newport Beach, CA 92663

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

CALLE REAL Waterline Improvements
Infrastructure
Results
$880,000 est. value
San Clemente, CA 92673

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

West Broadway Townhomes
Demolition, New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Anaheim, CA 92802

City Hall - Cast Iron Drainage Repipe - City of Costa Mesa
Infrastructure
Conception
$300,000 est. value
Costa Mesa, CA 92626

Last Updated 08/04/2022 12:32 AM
Project Title

Waterline Abandonment on Franklin Street and Stanton Avenue

Physical Address View project details and contacts
City, State (County) Buena Park, CA 90621   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $148,704 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 07, 2022, project was awarded to GCI Construction, Inc. in the amount of $133,704.00 with an contingency funds in the amount of $13,370 and authorize construction engineering fundsin the amount of $15,000. The Project includes, without limitation, furnishing all necessary labor, materials, eguipment and other incidental and appurtenant work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents ("Work"). This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the Engineer. Each prospective bidder ("Bidders") is responsible for fully acquainting themselves with the conditions of the scope of work as it relates to doing work in the City.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents