Similar Projects
Reported | 08/31/2021 10:47 AM |
Project Title | Pilot Lode Water Storage Tank Renovation |
Physical Address | View project details and contacts |
City, State (County) | Keystone, CO (Summit County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storage/Water Tanks |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor will perform an interior renovation of SRWD's Pilot Lode water storage tank during the Fall timeframe of this year. This project consists of the proper cleaning, rust removal and proper surface preparation of all interior surfaces of the Pilot Lode potable water storage tank which is .75MG, steel, above ground tank located in the Keystone, Colorado area, along with the proper caulking and re-coating of the tank interior with a coating that meets ANSI/NSF Standard 61, as outlined in our recent inspection report. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |