Similar Projects
WSP Culvert Storm Drain and Water Pipe Along with Related Products
Post-Bid
Carver, MA

Routine Maintenance and Drain Repairs
Post-Bid
Brockton, MA

Scheduled and Emergency Drainage Repairs and Improvements at various Locations
Results
Less than $685,975 est. value

Scheduled and Emergency Drainage Structure Reconstruction and Repairs at Various Locations
Results
Less than $637,000 est. value

Drilling IDIQ In Massachusetts and Rhode Island
Post-Bid

Egypt-Mann Hill Beach Cobble Berm Reconstruction Project
Results
Less than $1,093,185 est. value
Scituate, MA 02066

Brant Rock Seawall Reconstruction
Infrastructure
Post-Bid
Less than $2,800,000 est. value
Marshfield, MA

Installation of Catch Basins and Grading Soccer Field Parking Lot at Ted Williams Camp
Results
Lakeville, MA 02347

Minor Drainage Improvements, Asphalt Excavation, Cold-Planing, Paving, and Shoulder Restoration
Infrastructure
Post-Bid
$60,000 est. value
Hanover, MA 02339

Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Results
Less than $470,000 est. value

Drilling IDIQ in Massachusetts and Rhode Island
Results

Long Beach Seawall Rehabilitation Project
Results
Less than $1,000,000 est. value
Plymouth, MA 02360

North Nantasket Beach Dune Restoration and Accessibility
Results
Less than $170,000 est. value
Hull, MA

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Results
$680,575 est. value

Well 18B Backwash Discharge Piping
Results
$220,000 est. value
Scituate, MA

Reported 11/18/2021 12:00 AM
Project Title

Gunrock Beach Seawall Repairs

Physical Address View project details and contacts
City, State (County) Hull, MA   (Plymouth County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 10/27/21
Owner View project details and contacts
Architect View project details and contacts
Description

Gunrock Beach Seawall Repairs. Limited demolition of existing seawall and full demolition of timber platform and concrete beach access stairs. Construction of concrete encasement and cap on approximately 105 linear feet of existing seawall. Construction of concrete beach access stairs with seawall.

Details

Division 02 - Existing Conditions, Demolition.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Seawalls, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents