Similar Projects
Development of City-Owned Property at 1304 West Main Street
Demolition, Infrastructure
Bidding
Blue Springs, MO 64015

Property Maintenance Demolitions - 6 Locations
Demolition
Bidding
Saint Joseph, MO 64504

Prequalification for Demolition Contractors
Post-Bid
Independence, MO

Residential Solid Waste Collection of Trash, Recyclables and Yard Waste
Term Contract
Post-Bid
Hazelwood, MO

Building Demolition and Site Cleanup
Demolition
Results
Springfield, MO

Demolition Package
Demolition
Results
$800,000 est. value
Rolla, MO 65401

MoDOT Kansas City Litter Removal
Infrastructure
Bidding

Loading Transporting and Recycling of Electronic Waste
Term Contract
Post-Bid
Saint Charles, Wentzville, MO 63304

SEC - BOM 1, 2 and 3 - Demolition Package
Demolition
Results
$800,000 est. value
Rolla, MO

Lawn Maintenance
Infrastructure, Alteration
Bidding
Poplar Bluff, MO

Construction Management Services
Term Contract
Post-Bid
Jefferson City, MO

Building Demolition and Site Cleanup
Demolition
Results
Springfield, MO

Lagoon Cleaning at Wastewater Treatment Facility
Term Contract
Post-Bid
Kirksville, MO

Demolition and Removal of the Old Laclede County Jail
Demolition
Results
Lebanon, MO 65536

House Demolition
Demolition
Post-Bid
Jackson, MO

Last Updated 03/04/2022 11:47 AM
Project Title

Perry (Ralph and Martha) Memorial Conservation Area Range Complex Renovation, Recycling, and Soil Stabilization

Physical Address View project details and contacts
City, State (County) Sweet Springs, MO   (Saline County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Demolition, Hauling, Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of the Highway 23 Range to an undeveloped wildlife conservation area. This includes all labor, materials, equipment and dewatering to: conduct the demolition activities including removal of backstops, concrete shooting pads, miscellaneous debris, and a gravel foot path from the Highway 23 Range; Highway 23 Range Bullet/Fragment/Casing recovery and recycling; Highway 23 Range soil stabilization/treatment; soils at the Highway 23 Shooting Range requiring stabilization/treatment will be Processed for Bullet/Fragment/Casing recovery and recycling, then relocated for continued use as backstop or side berm material at the New Range; Soils requiring Processing for Bullet/Fragment/Casing recovery and recycling, but not requiring stabilization/treatment will be redistributed as final grading material at the Highway 23 Shooting Range; Demolished shooting pads and miscellaneous debris will be disposed of offsite: Gravel from the foot path will be redistributed as clean fill over existing Highway 23 Range gravel parking areas; Seeding and mulching of all disturbed areas; and Other Work indicated in the Contract Documents. West tract: from Concordia, take Highway 23 south 5 miles. East tract north of Blackwater River: from Concordia, take Highway 23 south approximately 4 miles, then east on NE 1200, area begins where NE 1200 turns north. East tracts south of Blackwater River: from Sweet Springs, take Highway 127 south, then Route NN west, and north on Blackwater Road, or west on Dunksburg Road. See map for additional access.

Details

Misc. Recreational, Renovation.
Division 02 - Existing Conditions, Demolition.
Division 13 - Special Construction.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents