Similar Projects
Last Updated | 01/21/2020 09:06 AM |
Project Title | Carpet Replacement 3rd Floor SCB and TCC |
Physical Address | View project details and contacts |
City, State (County) | Austin, TX 78711 (Travis County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $127,600 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Carpet replacement at the Supreme Court Building, located at 201 West 14th Street and the Tom C. Clark Building, located at 205 West 14th Street, Austin, TX. Provide all materials, equipment, labor, coordination and supervisory activities necessary to perform the following: 1. Replace existing carpet with Shaw Matmee style: 5T101 color: Tradition #99496 carpet tiles on 3rd floors per the building plans (yellow highlighting). 2. Contractor price to include all after hours labor, demo, haul off, disposal, minor floor prep, 4” cove base with toe, glue, flexlok tabs, tools, supplies, trash bin, box handling, furniture moving, and modular lift. 3. All Carpet to be installed using glue. 4. Contractor price to include cost of mandatory TFC criminal history fingerprint and background checks on all employees performing services on-site. 5. Contractor price to include payment and performance bonds, and insurance. 6. Obtain and verify actual measurements prior to ordering materials. Attachment B – Drawing is provided for bidding purposes only as reference material. 7. Contractor shall provide an extra 10 boxes of carpet for stock in addition to any left-over intact stock. 8. Jobsite must be cleaned daily so as not to disrupt employees or normal operations of affected area 9. Upon completion of the work, area will be cleaned, and all debris accumulated will be removed from job site. 10. Any area with flooring removed must have new flooring installed prior to next business day. 11. Material and labor on installation shall be warranted by Contractor for a period of one-year from the date of acceptance of work by TFC or manufacturer standard warranty, whichever is longer. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |