Similar Projects
Cloverdale Road, Victory Road / Overland Road - Ada County Highway District
Infrastructure
Conception
$1,250,000 CJ est. value
Boise, ID 83709

Cloverdale Road, Victory Road / Overland Road - Ada County Highway District
Infrastructure
Conception
$1,250,000 CJ est. value
Boise, ID 83709

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Store Local- Phase 1 Areas A, B and C
Demolition, Build-out, Infrastructure - 125,292 SF
Design
$5,410,000 CJ est. value
Boise, ID 83706

Dust Abatement Dirt Roads
Term Contract
Post-Bid
Dixie, Elk City, Meridian, ID 83525

Landfill NRC3 Lift C Horizontals Materials Purchase
Infrastructure
Post-Bid
ID

Molenaar Park Splash Pad Utilities
New Construction, Alteration
Results
Boise, ID

North 25th Street Extension
Infrastructure
Results
$30,000 est. value
Boise, ID 83702

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Lake Hazel Road and Maple Grove Road - Ada County Highway District
Infrastructure
Conception
$3,970,000 CJ est. value
Boise, ID 83709

Lake Hazel Road and Cloverdale Road - Ada County Highway District
Infrastructure
Design
$1,820,000 CJ est. value
Boise, ID 83709

State Highway 16 Water Main Improvements
Infrastructure
Post-Bid
Meridian, ID 83646

Last Updated 07/19/2023 03:06 PM
Project Title

Drainage / Roadway Improvements

Physical Address View project details and contacts
City, State (County) Orofino, ID 83544   (Clearwater County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $429,496 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 19 ,2023 the project was awarded to Debco Construction for $429,495.55 . A description of the work of this project can be summarized to include traffic control, pedestrian control,asphalt pavement removal, installation of erosion control measures, culvert removal/replacement, road subgrade re-shaping, road subgrade excavation including haul, installation of guard rail and terminals, installation of concrete curb and gutter, shaping of roadside ditches, installation of road base, installation of asphalt pavement, shoulder grading and surface restoration. Proposals will be opened and publicly read at the above hour and date. A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A Public Works Contractor's License for the State of Idaho is required to bid on this work. Estimated Cost: $530,000 Plans, specifications, proposal forms and other information are on file for examination at the following locations: State of Idaho Division of Public Works, 502 N. 4th St., Boise, ID 83702 (208) 332-1900 Associated General Contractors, 1649 W Shoreline Dr., Ste. 100, Boise, ID 83702 (208) 344-2531 https://www.idahoagc.org/plan-room Blueprint Specialties, 6205 W. Overland Rd., Boise, ID 83709 (208) 377-0294 www.docuproject.com Abadan Regional Plan Center; 603 E. 2nd Ave., Spokane, WA 99202. (509) 747-2964 www.abadanplanroom.com Lewiston & Clarkston Plan Center, 2117 12th Ave., Lewiston, ID 83501 (208) 746-3591 www.lcplancenter.com Spokane Regional Plan Center, 209 N Havana St., Spokane, WA 99202 (509) 328-9600 www.plancenter.net Parametrix, Inc. (Engineer) 1044 Northwest Blvd, Suite A202, Coeur d'Alene, ID 83814 (208) 664-9405

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents