Similar Projects
Z1dz--T1/ Project 554-22-136 Relocate Power for Patient Transport Cart Chargers (Va-22-00023703)
Term Contract
Design
$50,000 to $100,000 est. value
Aurora, CO 80045

Holiday Lighting
Alteration
Bidding
Fort Collins, CO

Farr Pump Plant Cooler Replacement
Renovation
Bidding
Grand Lake, CO

Generator Maintenance Services
Post-Bid
Less than $50,000 est. value
Greeley, CO 80631

Airport Carport Solar Project
Post-Bid
Colorado Springs, CO 80947

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

Dilution Refrigerator Helium Battery System
Results
Boulder, CO 80305

63Rd WTF Campus Electrical and High Service Pump Station Improvements
Alteration
Bidding
Boulder, CO

Generator Replacement
Post-Bid
Longmont, CO

UPS Battery Replacement and Installation
Results
Fort Carson, CO 80913

GWS Administration Parking Lot Lighting
Alteration
Bidding
CO

Backup Generator and Transfer Switch
Post-Bid
Fort Collins, CO

As-Needed Electrical Services
Term Contract
Results
Glenwood Springs, CO 81601

Island Grove Led Marquees
Post-Bid
Greeley, CO

GWS Administration and Courthouse Led Lighting Retrofit
Term Contract
Results
Glenwood Springs, CO 81601

Last Updated 03/29/2022 11:43 AM
Project Title

Energy Performance Contracting Services

Physical Address View project details and contacts
City, State (County) Gunnison, CO 81230   (Gunnison County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Specific projects to be evaluated in the IGA process include: 1. Lighting upgrades. 2. Window replacements. 3. Boiler replacements. 4. HVAC efficiency. 5. Pump and motor upgrades. 6. Building automation. 7. Renewable energy improvements such as solar PV under 25 kW. 8. Evaluation of ground source geothermal for pre-heating two pools. 9. Electric charging stations on City of Gunnison-owned distribution system. 10. Zero emission fleet vehicles. 11. Retro commissioning of a wastewater treatment plant. 12. Community solar gardens.

Details

Division 26 - Electrical, Packaged Generator Assemblies, Wind Energy Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents