Similar Projects
New Jail Construction
New Construction
Conception
$32,000,000 est. value
Ironton, OH

Regional Jail Expansion
Addition
Conception
OH

Mansfield & Richland Correctional Institution Renovations
Renovation
Design
$11,430,000 est. value
Mansfield, OH

Harrison County Jail
New Construction
Design
$15,000,000 est. value
Cadiz, OH

RFQ - Design Professional Services for Jail Renovation Project
Renovation
Bidding
$50,000,000 CJ est. value
Canton, OH 44705

RFQ Design - Cuyahoga County Corrections Center Project
Renovation
Post-Bid
$5,000,000 CJ est. value
Cleveland, OH 44113

MCI - General Renovations - Rebid
Renovation
Post-Bid
$2,716,000 CJ est. value
Marion, OH 43302

Gallipolis Developmental Center (GDC) AT Building HVAC and Roof Replacement
Renovation
Results
$4,284,900 CJ est. value
Gallipolis, OH 45631

London Correctional Institution (LoCI) Window Replacement Phase 2
Renovation
Results
$2,357,000 CJ est. value
London, OH 43140

River Program Building - State of Ohio Department of Youth Service
Renovation
Pending Verification
$6,800,000 CJ est. value
Massillon, OH 44646

Juvenile Correctional Facility - City of Bedford
Renovation
Pending Verification
$152,000,000 CJ est. value
Bedford Hts, OH 44146

New Jail
New Construction
Conception
$50,000,000 est. value
OH

Colubiana County Jail Remodel - Columbiana County
Demolition, Build-out
Design
$250,000 CJ est. value
Lisbon, OH 44432

RFQ Construction Manager at Risk - Ross Correctional Institution (RCI) General Renovations
Renovation
Post-Bid
$2,975,000 CJ est. value
Chillicothe, OH 45601

ODRC Operation Support Center Renovation
Renovation
Results
$6,706,800 est. value
Columbus, OH

Last Updated 04/27/2023 10:03 AM
Project Title

RFQ Construction Manager at Risk - Jail Renovation Construction Project

Physical Address View project details and contacts
City, State (County) Canton, OH 44705   (Stark County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Board of County Commissioners of Stark County, Ohio (the Owner), is soliciting Statements of Qualifications (SOQs) from qualified individuals or firms to provide Design Professional Services for its Jail Renovation Construction Project (the Project). The Owner reserves the right to add additional scope and services, if further improvements are identified and funds are available. The Owner anticipates that it will use a construction manager at risk delivery model for the construction of the Project. Qualifications received may be retained in a file maintained by the Owner for design professional qualifications, unless the firm specifically requests not to be included in this file; each firm is requested to provide annual updates to the qualifications to keep them current

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents