Similar Projects
Oakton Fire Station - Fairfax County
New Construction, Infrastructure
Conception
$18,000,000 CJ est. value
Fairfax, VA 22030

American Legion Post 177 Redevelopment
New Construction, Infrastructure
Design
$50,000,000 est. value
Fairfax, VA 22030

Popeyes Restaurant / Fairfax
New Construction, Infrastructure - 2,275 SF
Design
Fairfax, VA 22030

Occoquan Dam and Reservoir Diving Services
Term Contract, Infrastructure
Bidding
Fairfax, VA 22030

Sidewalk Construction, Hill Street
Infrastructure
Bidding
$200,000 CJ est. value
Fairfax, VA 22030

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Subgrade Stabilization
Infrastructure
Results

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

WillowWood Plaza Residential Development
New Construction, Infrastructure - 2,100 SF
Pending Verification
$100,000,000 CJ est. value
Fairfax, VA 22030

Sidewalk Construction, Hallman Street
Infrastructure
Bidding
$200,000 CJ est. value
Fairfax, VA 22030

Construction Manager at Risk - Construction Manager at Risk Willard-Sherwood Health and Community Center
New Construction - 95,000 SF
Post-Bid
$200,000 est. value
VA 22030

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Mixed-Use Market Feasibility Study and Implementation Strategy
Infrastructure
Bidding
$47,650 CJ est. value
Fairfax, VA 22030

Pump Station Force Main Lining
Infrastructure
Post-Bid
$499,999 CJ est. value
Fairfax, VA 22030

Last Updated 08/26/2022 08:38 AM
Project Title

Community Center Courts Renovations - Fairfax County

Physical Address View project details and contacts
City, State (County) Fairfax, VA 22030   (Fairfax City County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Misc. Recreational, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is a continuing project to resurface and provide improvements to basketball and tennis courts at Community Centers throughout the County. In order to ensure the safety and usability of the courts, a repair and replacement schedule has been created for the 22 existing courts. For exterior courts, this includes resurfacing each court every four years and complete replacement of each court every 12 years. The average lifespan of an exterior court is 10-15 years depending on the level of use, weather conditions, and other external/environmental factors. For interior courts, this includes buffing/screening each court annually and sanding/repainting/replacing each court every 15 years. Having the courts routinely repaired and replaced helps maintain the safe conditions of the courts, allows the courts to remain open for public use, and provides a longer lifespan. Funding for this project is being considered for American Rescue Plan Act (ARPA) funds for the next two years. This project is in included in the City's or County's FY 2023 - 2028 Capital Improvement Plan (CIP). As of August 26, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents