Last Updated | 06/19/2023 07:01 AM |
Project Title | Wheat Midds Storage & Handling Phase 1 - Electrical Package |
Physical Address | View project details and contacts |
City, State (County) | Grand Forks, ND 58203 (Grand Forks County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $180,000 [brand] Estimate |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | None of the payment will be refunded. Completeness and adequacy of the list of documents requested shall be the responsibility of the person making the request. Drawings and Specifications may be examined at the Owner's office at the address shown above or at the office of EAPC Industrial Services, 3100 DeMers Ave., Grand Forks, ND 58201 Description: The Project consists of: Providing and installing the electrical equipment, devices, conduit, and wiring in and around the new wheat midds and screenings handling building and conveying equipment from existing areas at the facility including the A-B Mill and terminal building. Work includes motors, receptacles, lighting, instrumentation, PLC's, power distribution equipment, Fire Alarm Systems, and grounding/lightning protection. Additional Description: LICENSE AND BID SECURITY. Each bid must be accompanied by a separate envelope containing the contractor's license and bid security. The bid security must be in a sum equal to five percent of the full amount of the bid including all add alternates, and must be in the form of a bidder's bond. A bidder's bond must be executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within ten days after notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond and any condition of the governing body. A countersignature of a bid bond is not required under this section. If a successful bidder does not execute a contract within the ten days allowed, the bidder's bond must be forfeited to the governing body and the project awarded to the next lowest responsible bidder. NORTH DAKOTA LAW. The Bidder must have a North Dakota contractor's license and must be licensed for the full amount of the Bid as required by NDCC 43-07-05 and 43-07-12; and no bid will be read or considered which does not fully comply with the above provisions as to bond and licenses. Any bid submitted deficient in these respects will be re-sealed and returned to the bidder immediately. THE OWNER reserves the right to waive irregularities in any bid, to reject any or all bids and to hold all bids for a period of 30 days after the date fixed for the opening thereof. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |