Similar Projects
F.O.B. County Garage
Infrastructure
Post-Bid
Joliet, IL

2021 Construction Projects
Infrastructure
Post-Bid
Joliet, IL

Asphalt
Infrastructure
Results
Joliet, IL

Stony Island Avenue Pavement
Infrastructure
Results
IL

Amigeaux's Restaurant
New Construction
Construction
Joliet, IL 60435

Olive Garden #6475
New Construction - 7,818 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Plainfield, IL 60586

Smoothie King w/ Drive Thru
New Construction - 20,000 SF
Pending Verification
Joliet, IL 60435

Restaurant, Quick Trip & Hotel
Addition, Build-Out - 10,000 SF
Pending Verification
Romeoville, IL 60446

Truck Travel Center
New Construction
Post-Bid
Peotone, IL 60468

Resurfacing With Hot-Mix Asphalt Binder and Surface Courses
Infrastructure
Results
$179,076 est. value
Lockport, IL 60441

Wendy's & New Multi-tenant Retail Site Work & Shell
Build-Out - 9,135 SF
Construction
Lockport, IL 60441

Olive Garden
Build-Out
Pending Verification
Joliet, IL 60436

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

RR-21-4583R Weigh-In-Motion Replacement
Infrastructure
Results
Homer Glen, IL 60491

Chicken-N-Spice
New Construction
Pending Verification
New Lenox, IL 60451

Last Updated 03/10/2023 11:08 AM
Project Title

Sparks Coffee

Physical Address View project details and contacts
City, State (County) Frankfort, IL 60423   (Will County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a drive through coffee shop. As of March 10, 2023, this project is pending approval from the planning commission and village board. A hearing date has not been set. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

945 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents