Similar Projects
Construction of Shem Creek Bike Lanes
Infrastructure
Bidding
$300,000 CJ est. value
Mount Pleasant, SC 29464

Wheelchair Ramp With Landing
Infrastructure
Post-Bid
$50,000 CJ est. value
Anderson, SC 29624

Public Works Concrete Work Phase II
Alteration
Post-Bid
Clemson, SC

Concrete Pads
Alteration
Results
Less than $100,000 est. value
SC

Concrete Asphalt Repair to a Fueling Station
Infrastructure, Alteration
Results
Sumter, SC

Luminaire Installation/Repairs
Infrastructure
Construction
$24,718 CJ est. value
Edgefield, SC 29824

District 4 Reclamation
Alteration
Post-Bid
Chester, Lancaster, York, SC 29745

Concrete
Alteration
Results
Roebuck, SC

Concrete
Alteration
Post-Bid
Columbia, SC

Mt. Zion Elementary School Portable Buildings
Renovation, Infrastructure
Results
$809,247 CJ est. value
Johns Island, SC 29455

RFP Paving Contractors - Hope Center for Children Parking Lots & Driveways
Infrastructure
Post-Bid
$200,000 CJ est. value
Spartanburg, SC 29306

Former Finance Building Structural and Plumbing Repairs for Office Use - Rebid
Renovation
Results
$340,620 CJ est. value
Columbia, SC 29212

Saluda Maintenance Concrete and Flowable
Infrastructure, Alteration
Post-Bid
Prosperity, SC 29127

Celebration Boulevard Sidewalk Improvements
Infrastructure
Results
$247,825 CJ est. value
Florence, SC 29501

New Gray Rock Road Water Main Extension
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Tega Cay, SC 29708

Last Updated 08/15/2023 10:46 AM
Project Title

GTC - Exterior Window and Door Replacement on Select Academic Bldgs 123/122

Physical Address View project details and contacts
City, State (County) Greenville, SC 29607   (Greenville County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $710,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 15 2023, project was awarded, start date is Mid of September and will be completed by end of this year** Base Bid work - complete removal and replacement of all glass fenestrations (windows and storefronts) and all exterior sealant joints for Building 123. Modifications, cleaning, and repairs to the interior finishes at/around the fenestrations and exterior masonry repairs and modifications are also included. ALT 1 includes the same scope of work as the Base Bid for the adjacent building, Building 122 and includes asbestos abatement of non-friable. Project Delivery Method: Design-Bid-Build Bid Security is Required in an Amount Not Less Than 5% of the Base Bid. The successful Contractor will be required to provide Performance and Labor and Material Payment Bonds, each in the amount of 100% of the Contract Price. Construction Cost Range: $1,600,000 to $1,900,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents