Similar Projects
Reported | 04/01/2022 12:00 AM |
Project Title | Design, Removal and Installation of Playground Equipment at Fish Hatchery Park |
Physical Address | View project details and contacts |
City, State (County) | Northville, MI 48167 (Wayne County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Removal and disposal of existing playground equipment, EWF, border. 2. Site prep (a). Excavation and grading of site (b). Addition of 3” of pea stone (c.) Installation of Geotextile fabric 3. Installation of new equipment; minimum requirement (a). Include (1) one climber as focal point in design (b). Designed for ages 5-12 4. Installation of new concrete play border 5. Installation of EWF with a minimum depth of 12” compacted, or per equipment and manufacturer recommendations if more is needed. 6. Restoration of surrounding areas with topsoil, seed and straw matting to its preconstruction condition including staging area. |
||
Details | Park/Playground, Renovation.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |