Similar Projects
Collective at Canton
New Construction - 90,800 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Baltimore, MD 21224

8001 Wisconsin Avenue - Mixed Use
New Construction, Build-Out - 15,000 SF
Conception
Bethesda, MD

Yard 56 Phase II
New Construction - 466,598 SF
Design
$10,000,000 CJ est. value
Baltimore, MD 21224

Residences at Forest Glen
New Construction - 219,315 SF
Sub-Bidding
$24,720,000 est. value
Silver Spring, MD 20902

Hampton Park Apartments
New Construction, Demolition - 238,183 SF
Post-Bid
Capitol Heights, MD 20743

The Hub at College Park
New Construction - 187,617 SF
Post-Bid
Less than $500,000 CJ est. value
College Park, MD 20742

Baltimore Street Garage Restoration
Results
$500,000 to $1,000,000 est. value
Baltimore, MD 21202

Longwell and Westminster Square Parking Garage Precast Deck Repairs
Results
Westminster, MD

Momentum at Shady Grove Station
New Construction - 170,548 SF
Construction
$22,000,000 to $23,000,000 est. value
Rockville, MD 20855

Alta Federal Hill Phase I
New Construction, Renovation - 1,038 SF
Construction
Less than $500,000 CJ est. value
Baltimore, MD 21230

Hillman Garage and City Dock Redevelopment
New Construction
Pending Verification
$56,000,000 to $62,300,000 est. value
Annapolis, MD

10 North Fremont Parking Garage
New Construction
Pending Verification
Baltimore, MD

Bethesda Senior Living Tower
New Construction - 300,000 SF
Conception
Bethesda, MD 20814

Stadium Square II Apartments
New Construction
Post-Bid
Baltimore, MD 21230

Glen Burnie Parking Garage Rehabilitation
Results
$1,000,000 to $1,500,000 est. value
Glen Burnie, MD 21061

Last Updated 01/05/2022 01:24 PM
Project Title

Helping Up Women's Center

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21202   (Baltimore County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Nursing/Rehabilitation Center, Parking Garage
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced fourth quarter 2019, Construction Complete as of December 2021
Bids Due View project details and contacts
Estimated Value $61,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Nursing/Rehabilitation Center, 7 Stories Above Grade, New Construction, Parking Garage, 2 Stories Below Grade, New Construction, Demolition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment, Commissioning of Conveying Equipment, Commissioning of Elevators.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents