Similar Projects
Bituminous Mill and Overlay and ADA Work - TH 223
Infrastructure
Conception
$2,200,000 CJ est. value
Leonard, MN 56652

Bituminous Mill and Overlay and ADA Work - TH 223
Infrastructure
Conception
$2,200,000 CJ est. value
Leonard, MN 56652

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Grading, Full Depth Reclamation, Bituminous Surfacing
Results
MN

Bridge Replacement - Remove Existing Bridge on Bridge 15J27
Demolition, New Construction, Infrastructure
Results
$174,030 CJ est. value
Bagley, MN 56621

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

2022 Bagley Water and Wastewater Phase1 Improvements
Infrastructure
Results
$5,318,000 est. value
Bagley, MN 56621

Aggregate Crushing and Surfacing
Infrastructure
Post-Bid
$196,393 CJ est. value
Bagley, MN 56621

Bridge Replacement Over Lost River Eddy Township
Demolition, New Construction, Infrastructure
Results
$288,340 CJ est. value
Eddy Township, MN 56634

Bridge Replacement
Infrastructure
Post-Bid
$400,000 CJ est. value
Eddy Township, MN 56634

Last Updated 07/25/2023 03:06 PM
Project Title

Grading, Bituminous Surfacing

Physical Address View project details and contacts
City, State (County) Bagley, MN 56621   (Clearwater County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $5,263,520 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 1, 2022, the project has been awarded. A timeline for construction has not been confirmed. The major quantities of work are as follows: Mill bituminous surface - 479,438 Square Yards, Type SP 9.5 Wearing Course Mixture (3,B) - 70,900 tons, Common Excavation - 4,534 Cubic Yards, Traffic barrier design Type 31 - 390 lin. Ft., Turf establishment - 1.0 lump sum, and Broken and Solid paint - 413,084 lin. ft. Work shall be completed by October 15, 2022. Bids must be accompanied by a certified check or corporate surety bond made payable to the Clearwater County Treasurer for at least five percent of the amount of the bid. The Clearwater County Board of Commissioners reserves the right to reject any and all bids and waive any defects or irregularities therein which may be in the best interest of the County of Clearwater. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents