Similar Projects
Last Updated | 08/24/2022 03:33 PM |
Project Title | RFQ D/B - Emergency Access Bridge |
Physical Address | View project details and contacts |
City, State (County) | Kannapolis, NC 28036 (Mecklenburg County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 24th, 2022, project has not been awarded. Selection is scheduled for next week. The City of Kannapolis is seeking to hire a qualified Design Build team to provide design and general contracting services for the repair of the emergency access bridge near Kingsview Drive for the Farm at River Pointe Subdivision in Kannapolis, NC. The design-builder shall provide a performance and payment bond to the governmental entity in accordance with the provisions of Article 3 of Chapter 44A of the General Statutes. Inquiries on the project or requests for additional information must be e-mailed to: Scott Kaufhold, PE, City Engineer, skaufhold@kannapolisnc.gov, no later than Wednesday, August 17, 2022, at 5:00 PM local time. Arrangements for site visits shall be made by calling Brent Yost at 704-920-4221. The City of Kannapolis will not be responsible for or bound by any oral instructions made by any employee(s) of the City of Kannapolis regarding this RFQ invitation. During the initial construction of the Farm at River Pointe Subdivision, the developer was required to install a temporary secondary access connecting to Kingsview Drive to provide emergency access to the subdivision in the event the primary access becomes impassable. The secondary access includes a temporary bridge over a small tributary which over time has eroded and compromised the integrity of the structure to a point that it is unsafe for emergency vehicle to utilize. To address the erosion issues, the existing bridge will be removed and the abutments on each side of the stream will be stabilized to provide adequate support for the structure. After the abutments are stabilized, the existing bridge will be re-set on the abutments and the wood deck replaced. Describe the program (plan) that your company has developed to encourage participation by local, minority and other HUB firms to meet or exceed the goals set by NC G.S. 143-128.2. Attach a copy of that plan to this proposal. Provide documentation of the local, minority and other HUB participation that you have achieved over the past two years on both public and private construction projects. Outline specific efforts that your company takes to notify recruit, and utilize local, minority and other HUB firms of opportunities for participation. Indicate the participation goal that you expect to achieve on this project. The selected Design Builder will be required to submit a final plan for compliance with Section 143-128.2 for City of Kannapolis approval prior to soliciting bids for the Project's first tier subcontractors. Consistent with the North Carolina Mini-Brooks Act (G.S. 143-64.31) and with the request for qualification process defined in G.S. 143-128.1A, qualified proposers are instructed to only submit qualifications for completing this project. The specific scope of work for the selected DB for the Project will be defined in the design build agreement; however, at a minimum the following services are required of the DB: Provide design build services including survey, design development and construction documents, cost estimating, value engineering, constructability reviews, scheduling, applying for and obtaining permits, etc. Preparation of shop drawings and submittals. Construction of the project including but not limited to all labor and materials to perform the construction work in accordance with this RFQ. Provide construction management and general contracting services. Provide record documents of as-built conditions on the project. The project will begin immediately upon negotiation and execution of the contract, and it is anticipated construction will complete within 270 days of the execution of the contract. The City of Kannapolis reserves the right to reject all proposals or accept such proposals, as appears in its own best interest, and to waive technicalities or irregularities of any kind in the proposal. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |